| [epf-dev] Resolving open/deferred PM bugs |
| 146439 | 2006-10-19 | maj | P2 | PC | RESO | EPF | Content | 0.9 | 1.0.0 | PM - Add new Concept: Project Team |
| 146457 | 2006-10-19 | maj | P2 | PC | RESO | EPF | Content | 0.9 | 1.0.0 | PM - Guideline: Prioritizing
Work - add content Suggest closing, never doing. I do not think this is critical. |
| 146461 | 2006-10-19 | maj | P2 | PC | RESO | EPF | Content | 0.9 | 1.0.0 | PM - Guideline: Staffing Project - add content
Keep - Suggest leveraging some content Scott has on generalizing specialist. |
| 146466 | 2006-10-19 | maj | P2 | PC | RESO | EPF | Content | 0.9 | 1.0.0 | PM - Guideline: Type and Frequency of Assessments - add c... - Suggest closing, never doing. I do not think this is critical. |
|
146467 | 2006-10-19 | maj | P2 | PC | RESO | EPF | Content | 0.9 | 1.0.0 | PM - Guideline: Types of Metrics - add content
Suggest closing, never doing. I do not think this is critical. |
| 146476 | 2006-10-19 | maj | P2 | PC | RESO | EPF | Content | 0.9 | 1.0.0 | PM - Concept: Building Effective Teams
- add content Suggest closing, never doing. I do not think this is critical. |