Cancel a checkout. The partially-checked-out project remains in the workspace (okay), but it has no sharing information. This might not be a bug, but I kind of expected that it would have had sharing info and the cvs nature set on it, even though I cancelled. That would at least have given me a hope of recovering with a Synchronize at a later time.
When I do this, the project IS shared and synching shows the rest of the contents as incoming additions. Was there anything in the log?
Unknown.
This seems to happen if the cancelation happens before any subfolders are loaded.
later
Reopening
This was fixed in 3.0. Project is still only partially loaded but it is shared.