Bug 19167 - [CVS UI] Cancelling checkout leaves a partial unshared project in workspace
Summary: [CVS UI] Cancelling checkout leaves a partial unshared project in workspace
Status: RESOLVED WORKSFORME
Alias: None
Product: Platform
Classification: Eclipse Project
Component: Team (show other bugs)
Version: 2.0   Edit
Hardware: PC Linux
: P3 normal (vote)
Target Milestone: ---   Edit
Assignee: Platform-VCM-Inbox CLA
QA Contact:
URL:
Whiteboard:
Keywords: usability
Depends on:
Blocks:
 
Reported: 2002-06-04 14:44 EDT by James Moody CLA
Modified: 2004-07-14 06:43 EDT (History)
0 users

See Also:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description James Moody CLA 2002-06-04 14:44:08 EDT
Cancel a checkout. The partially-checked-out project remains in the workspace
(okay), but it has no sharing information. This might not be a bug, but I kind
of expected that it would have had sharing info and the cvs nature set on it,
even though I cancelled. That would at least have given me a hope of recovering
with a Synchronize at a later time.
Comment 1 Michael Valenta CLA 2002-06-05 10:14:46 EDT
When I do this, the project IS shared and synching shows the rest of the 
contents as incoming additions. Was there anything in the log?
Comment 2 James Moody CLA 2002-06-05 10:24:17 EDT
Unknown.
Comment 3 Michael Valenta CLA 2002-06-05 12:00:31 EDT
This seems to happen if the cancelation happens before any subfolders are 
loaded.
Comment 4 Kevin McGuire CLA 2002-06-13 14:34:45 EDT
later
Comment 5 Michael Valenta CLA 2002-09-09 15:11:06 EDT
Reopening
Comment 6 Michael Valenta CLA 2004-07-14 06:43:47 EDT
This was fixed in 3.0. Project is still only partially loaded but it is shared.