Bug 163872 - PM - Examples need better alignment to OpenUP/Basic disciplines and target audience
Summary: PM - Examples need better alignment to OpenUP/Basic disciplines and target au...
Status: NEW
Alias: None
Product: z_Archived
Classification: Eclipse Foundation
Component: EPF (show other bugs)
Version: unspecified   Edit
Hardware: PC Windows XP
: P4 normal with 1 vote (vote)
Target Milestone: ---   Edit
Assignee: epf.content-inbox CLA
QA Contact:
URL:
Whiteboard:
Keywords:
Depends on: 184474 189673
Blocks:
  Show dependency tree
 
Reported: 2006-11-08 16:31 EST by Jim Ruehlin CLA
Modified: 2023-02-16 16:17 EST (History)
1 user (show)

See Also:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description Jim Ruehlin CLA 2006-11-08 16:31:52 EST
Iteration Plan
•  See remarks for Template: Iteration Plan for formatting changes in bug https://bugs.eclipse.org/bugs/show_bug.cgi?id=163869
•  Key Milestone should be clearer
     What's being shown at the demo? The milestone should indicate the critical feature being demoed.
•  Evaluation criteria needs to be concrete
     "Favorable response", "well received", and "favorable acceptance" isn't concrete enough. There needs to be a concrete sign-off, an OK, or something that can objectively close the evaluation criteria.

Project Plan
•  This example isn't for a development project - we should provide something from software development
•  Role assignments need to be shown to match the template
•  The measurements should provide an example that follows the recommendations of the Guideline: Agile Estimation
•  Make scope of project plan consistent
The Introduction says the plan does not apply to the tooling component, but the Milestones section includes tooling.
Comment 1 Ricardo Balduino CLA 2007-04-02 13:27:06 EDT
Assigning bugs from content inbox to package owner, as per decision during C1 iteration assessment.
Comment 2 Ana Pereira CLA 2007-05-04 06:01:00 EDT
lowering the priority as discussed on PM call on April 16 
Comment 3 Ana Pereira CLA 2007-05-19 05:05:39 EDT
This examples will have to be reviewed based on changes to templates made on bug 184474 ... 
Comment 4 Ana Pereira CLA 2007-05-29 11:42:21 EDT
depends on template for the project plan (to be updated on bug 189673)
Comment 5 Ana Pereira CLA 2007-06-27 10:56:10 EDT
Moving to M10 ... I will not have time to address this in M9
Comment 6 Per Kroll CLA 2007-07-20 16:40:30 EDT
All good points. I suggest we move this 1.0.1, I do not have energy to address... and it is getting late...
Let's face it, our examples should come from other projects using OpenUP, not our project or home-made examples, so let's focus on harvesting from real projects. <Well, our development of OpenUP is real, but it is different to develop OpenUP and develop software, so let's take one from a SW dev project>

My 2 cents
Comment 7 Ana Pereira CLA 2007-07-22 13:13:49 EDT
I could not agree more ... moving to 1.0.1
Comment 8 Ana Pereira CLA 2007-09-12 10:11:58 EDT
Hi steve

Do you have any software development related examples that we could use to solve this bug?
Comment 9 Ana Pereira CLA 2008-05-21 12:12:40 EDT
Examples should come from projects using Eclipse Practice Library (version 1.5) so I am postponing this to 2.0