Matthias,
You should give it the +2 yourself and then it the submit
button. I assume you have authorization to do that and if not,
you should get it.
I did it for you this time, in case you are not already
authorized...
Cheers,
Ed
On 26.08.2019 10:46, Matthias Wienand
wrote:
Hi,
I updated the GEF contribution for 2019-09 Simrel M3
to 5.2.0, which is available for review here:
Thanks in advance for the review :-)
Best regards
Matthias Wienand
--
Matthias
Wienand
B.Sc. Softwaretechnik
Software Engineer
Telefon: +49 231 9860 202
Telefax: +49 231 9860 211
Mobil: +49 176 248 950 82
matthias.wienand@xxxxxxxxx
http://www.xing.com/profile/Matthias_Wienand2
http://www.itemis.de
itemis AG
Niederlassung Lünen
Am Brambusch 15-24
44536 Lünen
Rechtlicher Hinweis:
Amtsgericht Dortmund, HRB 20621
Vorstand: Jens Wagener (Vors.), Wolfgang Neuhaus,
Abdelghani El-Kacimi
Aufsichtsrat: Prof. Dr. Burkhard Igel (Vors.),
Michael Neuhaus, Jennifer Fiorentino
Hi,
as correctly stated on the
participation page, Eclipse Marketplace Client will
participate in the release. But our version number
will be 1.8.0 instead of 1.7.7. We had updated the
aggrcon file and created a corresponding release
record a while ago. Did we miss something or was
that just not updated on the participation page?
Best regards,
Leif
I've
updated the 2019-09 participation page based on the
information available. A great many projects (26 at
this point in time) have not yet
indicated that they are participating in the
release. The instructions are here.
The
opt-in deadline was August 9.
I have updated the participation page with the
information that I have available. Let me know
if I've got anything wrong.
Per the Simultaneous Release participation rules,
every participating project needs to signal
their continued participation by making a
change (any change) to the project's aggrcon
file. If your contribution will be a new
release of your content, you must also create
a release record. The date on the release
record should be the date of the release
(2019-09-18); when I add your project to the
list, I pick the release record with a date on
or before the date of the Simultaneous
Release.
Note that changes made the Eclipse
Development Process require a release review
(and IP Log review) only if the release is
major or minor and your project has not done a
release review in the past year. As always,
service releases do not require a review. Do
note, however, that you are still required to
have all of your intellectual property fully
vetted and cleared by the IP Team before it
can be included in any release (regardless of
whether or not you engage in a review).
I'll check again and update the
participation list accordingly next week. The
opt-in deadline is M2, so after tomorrow...
you're late.
Thanks for your attention.
Don't panic yet. I
start to build this list in earnest around
the M2 mark.
I'll make sure that
Eclipse Web Tools makes the list.
--
Wayne Beaton
Director of
Open Source Projects | Eclipse
Foundation, Inc.
--
Wayne
Beaton
Director
of Open Source Projects | Eclipse Foundation,
Inc.
--
Wayne Beaton
Director of Open Source
Projects | Eclipse
Foundation, Inc.
_______________________________________________
cross-project-issues-dev mailing
list
cross-project-issues-dev@xxxxxxxxxxx
To change your delivery options,
retrieve your password, or unsubscribe from this list,
visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@xxxxxxxxxxx
To change your delivery options, retrieve your password, or unsubscribe from this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
|