Hi,
I updated the GEF contribution for 2019-09 Simrel M3 to 5.2.0, which is available for review here:
Thanks in advance for the review :-)
Best regards Matthias Wienand
--
Matthias Wienand B.Sc. Softwaretechnik Software Engineer Telefon: +49 231 9860 202 Telefax: +49 231 9860 211 Mobil: +49 176 248 950 82 matthias.wienand@xxxxxxxxxhttp://www.xing.com/profile/Matthias_Wienand2 http://www.itemis.de itemis AG Niederlassung Lünen Am Brambusch 15-24 44536 Lünen Rechtlicher Hinweis: Amtsgericht Dortmund, HRB 20621 Vorstand: Jens Wagener (Vors.), Wolfgang Neuhaus, Abdelghani El-Kacimi Aufsichtsrat: Prof. Dr. Burkhard Igel (Vors.), Michael Neuhaus, Jennifer Fiorentino
Hi, as correctly stated on the participation page, Eclipse Marketplace Client will participate in the release. But our version number will be 1.8.0 instead of 1.7.7. We had updated the aggrcon file and created a corresponding release record a while ago. Did we miss something or was that just not updated on the participation page? Best regards, Leif I've updated the 2019-09 participation page based on the information available. A great many projects (26 at this point in time) have not yet indicated that they are participating in the release. The instructions are here. The opt-in deadline was August 9. I have updated the participation page with the information that I have available. Let me know if I've got anything wrong. Per the Simultaneous Release participation rules, every participating project needs to signal their continued participation by making a change (any change) to the project's aggrcon file. If your contribution will be a new release of your content, you must also create a release record. The date on the release record should be the date of the release (2019-09-18); when I add your project to the list, I pick the release record with a date on or before the date of the Simultaneous Release. Note that changes made the Eclipse Development Process require a release review (and IP Log review) only if the release is major or minor and your project has not done a release review in the past year. As always, service releases do not require a review. Do note, however, that you are still required to have all of your intellectual property fully vetted and cleared by the IP Team before it can be included in any release (regardless of whether or not you engage in a review). I'll check again and update the participation list accordingly next week. The opt-in deadline is M2, so after tomorrow... you're late. Thanks for your attention. Don't panic yet. I start to build this list in earnest around the M2 mark. I'll make sure that Eclipse Web Tools makes the list.
-- Wayne Beaton Director of Open Source Projects | Eclipse Foundation, Inc.
-- Wayne Beaton Director of Open Source Projects | Eclipse Foundation, Inc.
-- Wayne Beaton Director of Open Source Projects | Eclipse Foundation, Inc. _______________________________________________cross-project-issues-dev mailing listcross-project-issues-dev@xxxxxxxxxxxTo change your delivery options, retrieve your password, or unsubscribe from this list, visithttps://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
|