The build fix has been made yesterday and checked in to git.
Chezy is working with his team to upload the build
--Rima
-----Original Message-----
From: cross-project-issues-dev-bounces@xxxxxxxxxxx [mailto:cross-project-issues-dev-bounces@xxxxxxxxxxx] On Behalf Of cross-project-issues-dev-request@xxxxxxxxxxx
Sent: Friday, May 09, 2014 9:00 AM
To: cross-project-issues-dev@xxxxxxxxxxx
Subject: cross-project-issues-dev Digest, Vol 100, Issue 9
Send cross-project-issues-dev mailing list submissions to
cross-project-issues-dev@xxxxxxxxxxx
To subscribe or unsubscribe via the World Wide Web, visit
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
or, via email, send a message with subject or body 'help' to
cross-project-issues-dev-request@xxxxxxxxxxx
You can reach the person managing the list at
cross-project-issues-dev-owner@xxxxxxxxxxx
When replying, please edit your Subject line so it is more specific
than "Re: Contents of cross-project-issues-dev digest..."
Today's Topics:
1. Luna M7 staging repository is complete (minus BIRT)
(David M Williams)
2. Luna M7 Sim. Release Repositories (and Packages) are
available (David M Williams)
----------------------------------------------------------------------
Message: 1
Date: Thu, 8 May 2014 12:22:39 -0400
From: David M Williams <david_williams@xxxxxxxxxx>
To: cross-project-issues-dev@xxxxxxxxxxx
Subject: [cross-project-issues-dev] Luna M7 staging repository is
complete (minus BIRT)
Message-ID:
<OF69A60BEC.52E74F58-ON85257CD2.00591254-85257CD2.0059F6F8@xxxxxxxxxx>
Content-Type: text/plain; charset="us-ascii"
Having heard nothing, I assume it'll take BIRT longer than we have to
produce a compatible build, so we'll do what we can without their
contribution in M7. I know several of you disabled some features that
depend on BIRT, so at least you can be partially functional in M7 (thanks
for that extra effort).
I've disabled the aggregation job to avoid confusion, and will restart it
Friday afternoon.
The reports are still running, and suspect Markus might want to regenerate
EPP packages to be sure they match repo.
As far as I know, we can/will still deliver M7 on Friday, but may be
"later" in the day, depending on how quickly package maintainers can
"sign-off".
I will (probably) still make the repo visible early on Friday, but will
discuss more with Markus, to see if he'd prefer we coordinate to a closer
time.
Thanks all!
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://dev.eclipse.org/mailman/private/cross-project-issues-dev/attachments/20140508/08959cd6/attachment.html>
------------------------------
Message: 2
Date: Fri, 9 May 2014 09:28:25 -0400
From: David M Williams <david_williams@xxxxxxxxxx>
To: cross-project-issues-dev@xxxxxxxxxxx
Subject: [cross-project-issues-dev] Luna M7 Sim. Release Repositories
(and Packages) are available
Message-ID:
<OF14EE7C89.67B703ED-ON85257CD3.0048396A-85257CD3.004A036C@xxxxxxxxxx>
Content-Type: text/plain; charset="us-ascii"
Markus and I have "turned on" the M7 repositories, so they will be
available this morning to those with existing installations.
That's from the "built in" repository, at
http://download.eclipse.org/releases/luna/
The EPP packages will be available for download soon (if not already, by
the time you read this), from
http://www.eclipse.org/downloads/index-developer.php
Note: normally the repository at .../releases/luna is a composite of
current milestone plus 2 previous milestones (this is to facilitate some
forms of testing and give a real ability to "roll-back" an upgrade).
This time, however, it will be just M7. The reason is due to some
substantial changes (such as absence of BIRT, one or more projects have
gone "down" in version numbering ... and while I don't know of any
concrete problem caused by these changes, typically they do cause problems
in things not installing at all, or not installing correctly) and while
limiting the repo to just M7 won't necessarily avoid all such "mis-match"
problems, I hope it will reduce them).
Congratulations to all and thanks for your participation!
Test well ... RC1 in two short weeks!
Thanks,
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://dev.eclipse.org/mailman/private/cross-project-issues-dev/attachments/20140509/c8355c0a/attachment.html>
------------------------------
_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
End of cross-project-issues-dev Digest, Vol 100, Issue 9
********************************************************