[wtp-releng] How are we going to finish WTP 3.2.4?

Granted, I've been half a sleep this week, hopped up on cold medications, but I was surprised when I stepped back to look at WTP 3.2.4 now that we have entered ramp down. I was surprised to see

A. 13 features still need versioning tweaks (see bug 342908 [1]).

B. There are still 88 bugs targeted to 3.2.4 (or Dali 2.3.4) ... 11 of those "major" and 1 of those a "hot bug", not to mention a few other 'normals' marked as P1 or P2. I think we accidentally skipped that section [2] in status meeting this week ... or, maybe I just slept through it, and its well understood what needs to be done?

At any rate ... we have begun ramp down and are now asking for PMC Review ... I've prepared a summary page [3] ... but, I suspect only those 11 "majors" should be considered candidates. But, that brings us back to the beginning ... to finish WTP 3.2.4 we first need to triage that bug list ... quick!

Thanks everyone,


[1] https://bugs.eclipse.org/bugs/show_bug.cgi?id=342908

[2] http://wiki.eclipse.org/WTP_2011-04-14#Bug_Review

[3] http://www.eclipse.org/webtools/plans/3.2.4/pmc-bug-approval.php