Re: [platform-releng-dev] power failure in build lab
|
For those of you keeping score at home, the build lab in Ottawa has so far
endured:
1. power outages
2. floods
3. lightning
To have a complete set of disasters of biblical proportions, all we need is
locusts now :)
Wassim.
Kim
Moir/Ottawa/IBM@I
BMCA To
Sent by: platform-releng-dev@xxxxxxxxxxx
platform-releng-d cc
ev-bounces@eclips
e.org Subject
[platform-releng-dev] power failure
in build lab
02/05/2007 05:54
PM
Please respond to
"Eclipse platform
release
engineering
list."
<platform-releng-
dev@xxxxxxxxxxx>
Several electrical circuits in our build lab died at around 5pm. The UPS
for our main build server ran out of power and consequently, the tests from
the I20070205-1300 build were stopped. I have connected the build machines
to different circuits and will be following up with the building manager
regarding power supply to our lab in the morning.
I won't be restarting the tests from the I20070205-1300 build. The next
build begins at 6pm.