Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [platform-releng-dev] Performance re-testing on releases and 3.1 milestones


Andre has already fixed this in HEAD and is backporting the changes to the other perf branches.

On an added note, it was decided in the architecture call today that we will not retest on the 3.1 milestones previous to M6.  I have updated the test schedule here:

http://dev.eclipse.org/viewcvs/index.cgi/%7Echeckout%7E/platform-releng-home/performance_test_plan.htm

Sonia



Darin Swanson <Darin_Swanson@xxxxxxxxxx>
Sent by: platform-releng-dev-bounces@xxxxxxxxxxx

04/13/2005 01:02 PM

Please respond to
"Eclipse platform release engineering list."

To
"Eclipse platform release engineering list." <platform-releng-dev@xxxxxxxxxxx>
cc
Subject
Re: [platform-releng-dev] Performance re-testing on releases and 3.1        milestones






Can we be kept posted on if the default dimension will be changed to Elapsed Process from CPU time within Performance.assertPerformance(PerformanceMeter)?

https://bugs.eclipse.org/bugs/show_bug.cgi?id=91295


If this change is made before 11pm (Ottawa time) Thursday, April 14, I do not believe I will need to make any modifications for the Ant performance tests


Thanks in advance

Darins



Sonia Dimitrov <Sonia_Dimitrov@xxxxxxxxxx>
Sent by: platform-releng-dev-bounces@xxxxxxxxxxx

04/12/2005 02:17 PM

Please respond to
"Eclipse platform release engineering list."

To
platform-releng-dev@xxxxxxxxxxx
cc
Subject
[platform-releng-dev] Performance re-testing on releases and 3.1        milestones








Starting this Friday, we would like to run performance tests on previous releases (starting at 2.1.3) and 3.1 milestones to generate a new history of performance measurements on four newly configured performance test machines.  These will consist of two identical "slower" machines (Intel P4 2 GHz, 512 MB RAM) and two identical "fast" machines (Intel P4 3 GHz, 2 gig RAM) which will run Windows XP (SP1) and Red Hat Enterprise Linux WS 3.  This task will require approximately 80 hours to complete and if all goes smoothly, we expect to have all the re-testing done by Wednesday April 20.  


Please see http://dev.eclipse.org/viewcvs/index.cgi/%7Echeckout%7E/platform-releng-home/performance_test_plan.htm for further details and background.


In order for us to proceed, we ask ALL teams using CPU Time in assertions and summaries (ie. fingerprints) to switch to using Elapsed Process in HEAD and perf_* streams of your tests where needed by 11pm (Ottawa time) Thursday, April 14.


Please respond to this list with questions or comments.


Sonia
_______________________________________________
platform-releng-dev mailing list
platform-releng-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/platform-releng-dev

_______________________________________________
platform-releng-dev mailing list
platform-releng-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/platform-releng-dev


Back to the top