Agenda
1. [Brian] 1.1M3 (25 July Target
Date, Lock Down Point on July 23) Review of next steps for
milestone.
See: http://wiki.eclipse.org/Higgins_1.1M3
<http://wiki.eclipse.org/Higgins_1.1M3>
·
[Brian]
Sent an email out last night. I
went through the remaining open items and moved them out to M4 with the noted
exceptions. Some were requests for
some fixes to be included in M3 and the other is for the Google context CP. Not sure if it is done. So, we are ready to go. The only open issue is Ranjans 4
bugs. So depending on the status of
those we could delay the M3 for these items.
·
[Andy?]
I havent had the chance to look at them.
Both of them (Jim and Tom) are gone today.
·
[Brian]
So we could hold off a few days if these items need to be done. Or we could do
an intermediate build. The prudent thing to do might be to wait until early next
week to get feedback from Tom and Jim.
If it just means to wait a few days
. Then we can make a
determination. If people agree with
that approach
·
[Ranjan] Would like to get into M3, but would
like to get a sense of how long it would take.
·
[Brian]
If no more comments, we will temporarily postpone M3 so that we can get feedback
on the timing of these 4 items.
·
[Ranjan]
Do we already have a date for M4?
·
[Brian
] It is 6 weeks from Friday, September 5.
2.
[Brian] Nightly Auto-Test
·
Next
step was getting Mike together with Thomas H. of Buckminster (any
update?)
·
[Mary]
The next item is Auto-Test.
·
[Brian]
Had a good meeting with Mike and Thomas of Buckminster this week to go over his
STS
component and its build needs. Mike
is working with the Buckminster platform.
·
[Mike]
What Im currently doing is trying to get that headless Buckminster to build my
work space, and Im working with Thomas on issues.
·
[Brian] The goal is to understand the capability
of the Buckminster platform. From there we can make the appropriate
determination on the ultimate goal of using it for auto
testing.
3.
[Brian & David] Internationalization
·
Are
proceeding with Phase 1 which is internationalizing IdAS.
·
See
http://wiki.eclipse.org/Internationalization_Support
·
Have
plan to use subset of Equinox jar for dependency
·
http://dev.eclipse.org/viewcvs/index.cgi/org.eclipse.osgi/supplement/src/org/eclipse/osgi/util/NLS.java
- [Brian]
David is on the phone. He has an update
.
- [Mary] The Equinox project lead has agreed to
let us use a subset of their code to meet the dependency
need.
- [Ranjan]
I appreciate your taking care of this.
- [David]
So what would be the next thing to do.
- [Brian]
Should publish it to the community. Ranjan, has anyone had time to look
over the code? If we are ok with that
- [David]
Im not sure how to distribute it.
- [Mary]
Send it to the list. Since the
third party dependencies are not yet approved, you cant commit it to
SVN.
- [Mike] He is not a committer, so he should
enter a bugzilla item and then send the code to the dev list. Just attach the code.
-
.
- [David] Ranjan is
reviewing the code with Greg. Not
sure if Mike had a chance to look at it or not.
- [Greg] I'm reviewing the code now, so
people can look at it.
- [David] Thank you Greg.
- [Ranjan] Is this targeted for M3?
- [Greg] Right now it is targeted for
M4.
- [Brian]
The best case delay for M3 might be a week, maybe a little more. If it is more, we may just cap it,
then figure out how to do another build between M3 and M4, if necessary. We can collaborate to figure out which
is the best one for everyone.
- [Greg]
The concern I have is that some of these are API
changes, and we may need some time to filter these through.
- [Mary]
Anything else?
- [Greg]
I will follow-up and then send a note to the dev list.
4.
[David, Greg, Markus, Rajalakshmi] Adding contexts dynamically to the
IdASRegistry
·
Proposals
are here: http://wiki.eclipse.org/Higgins_Configuration_Management
·
Any
update from David?
(editing
system difficulties)
5.
[Mary] Next F2F?
·
Suggestion:
Just after DIDW (10-12)
·
DIDW:
http://public.cxo.com/conferences/index.html?conferenceID=24
- [Mary] Last week we had talked about the
possibilities of having a Higgins Face-to-Face meeting after the Digital
Identity World event in September. The meeting could start at 4:00
on the 10th after DIDW ends. I just created a doodle for people to
indicate when they could attend.
- [Mary]
The doodle link is http://www.doodle.ch/n5ndur33y5nz6kqw
6.
[Mary] Home page design update
·
Have
made more progress on the Media Wiki skins. Are now in the debugging
stage.
§
[Mary] We
are now in the progress of debugging the wiki skin facility.
§
[Mary] Any other
topics?
§
Silence.
§
[Mary] Then we can end the
call early and go back to work.