[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
[higgins-dev] Agenda for today's call
|
Dial-in: 1-866-362-7064 / 892048#
Time: noon EDT (1700 London, 1800 Vienna)
Agenda
======
1) [Brian] 1.1M2 (13-June target)
---------------------------------
* See: http://wiki.eclipse.org/Higgins_1.1M2
* To support the release target date we ask that any open issues
planned for M2 be closed by 11-June.
* As a reminder for 1.1M2 bug owners as listed in the below link to please
go through your bugs and categorize them as:
1. Move them to fixed state if completed
2. Leave them on this list if you can commit to have
them completed by 11-June
3. Move them to a future milestone (M3 or "Backlog").
* See [1] below for the link
2) [Paul] HOWL 1.21 Update
--------------------------
* See: http://wiki.eclipse.org/HOWL_Update_1.21
3) FC2 Consortium / Higgins Meeting
-----------------------------------
* See: http://www.fc2consortium.org/indexen.html
* Paul had all-day meeting June 2 in Paris with them
4) [Jim] IdAS Refactoring
-------------------------
* Discussion?
5) R-Card Design Work
---------------------
* Need to arrange a conf call
* Pull together some separate discussions happening with
John Bradley about OpenID i-cards, with VRM folks, etc.
* Paul to send out suggested times, etc.
Links
=====
[1]
https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_t
ype=allwordssubstr&short_desc=&classification=Technology&product=Higgins&tar
get_milestone=1.1M2&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_ty
pe=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status
_whiteboard=&keywords_type=allwords&keywords=&emailtype1=substring&email1=&e
mailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&ch
fieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&fi
eld0-0-0=noop&type0-0-0=noop&value0-0-0=