Hi,

does anyone have any idea how good the gyrex jobs can handle large amounts of tiny jobs?

We have a case with an estimate of 10000+ jobs, which are in itself not that much time consuming. Point is, we have to be able to repeat them like every 3 minutes (not all at the same time) in a cluster that will be sized appropriately. The question is, if there is some experience, if the implementation can handle such a load. In the future we might be facing over 30000 Jobs.