I would propose:

M4  2009-06-26  0.9M4
M5  2009-07-10  0.9M5 (Feature Freeze)
RC1 2009-07-17  0.9RC3
RC2 2009-07-24  0.9RC4

My thinking is to add another line in the sand, between now and the feature freeze, that allows us to create a new and noteworthy document, and to assess what else we want to include in the last new and noteworthy that we produce for the feature freeze on July 10th. Definitely *not* to slow us down by means of an official test pass or anything like that until we are in the RC phase.

Having daily builds will be useful, I don't care whether they are N-style or I-style builds - whatever is easiest for Paul to setup would be my preference.

Boris  

e4-dev-bounces@xxxxxxxxxxx wrote on 06/08/2009 02:35:40 PM:

>
> Just to clarify what I was proposing wrt schedule:
>
> Current:
> M4 06/19/2009   0.9M4 (Feature Freeze)
> RC1 07/03/2009   0.9RC1
> RC2 07/10/2009  0.9RC2
> RC3 07/17/2009  0.9RC3
> RC4 07/24/2009  0.9RC4
>
> Proposed:
> M4 07/10/2009   0.9M4 (Feature Freeze)
> RC1 07/17/2009  0.9RC3
> RC2 07/24/2009  0.9RC4
>
> Boris and I discussed briefly whether we should add M5 so that M4
> doesn't stretch so long.  My feeling is that for many of us we
> effectively just started M4 so adding another milestone is of
> limited value.  However, since we're not doing one week of
> test/fix/etc. with the milestones, I'm ok adding an M5 under the
> belief that adding a milestone removes nothing from our development pace.
>
> Kevin
>
>

>
> Kevin McGuire/Ottawa/IBM@IBMCA
> Sent by: e4-dev-bounces@xxxxxxxxxxx

> 06/08/2009 02:20 PM
>
> Please respond to
> E4 Project developer mailing list <e4-dev@xxxxxxxxxxx>

>
> To

>
> E4 Project developer mailing list <e4-dev@xxxxxxxxxxx>

>
> cc

>
> Subject

>
> Re: [e4-dev] [releng] Next week is 0.9 M4 week

>
>
>
>
>
> Great! What would you suggest as an end game approach?
> A) What I proposed (take two weeks away from RC and move to M4)
> B) One week only of RC at the end?
> C) Hack like mad until last minute (actually, I like this one <g>)
> D) Other?
>
> Kevin
>

>
> Boris Bokowski/Ottawa/IBM@IBMCA
> Sent by: e4-dev-bounces@xxxxxxxxxxx

> 06/08/2009 02:08 PM
>
> Please respond to
> E4 Project developer mailing list <e4-dev@xxxxxxxxxxx>

>
> To

>
> E4 Project developer mailing list <e4-dev@xxxxxxxxxxx>

>
> cc

>
> Subject

>
> Re: [e4-dev] [releng] Next week is 0.9 M4 week

>
>

>
>
>
>
>
> +1 on not doing the usual Eclipse end game for e4 0.9. We should be
> building a tech preview, not a stable product.
>
> Boris
>
> e4-dev-bounces@xxxxxxxxxxx wrote on 06/08/2009 02:05:33 PM:
>
> >
> > >Since we are approaching our 0.9 M4 (feature freeze) next week
> >
> > I'd like us to discuss whether we believe we should be applying the
> > normal Eclipse shutdown pattern to e4.  That pattern is in place to
> > ensure that we ship a stable framework which products can, with high
> > confidence, build on.  We purposely trade innovation for stability.
> >
> > However, e4 is an incubator. As such, its goal *is* innovation with
> > no product level promises of stability.
> >
> > I believe this shutdown process will prematurely force us to
> > converge on what we basically have today. Those of us working on 3.x
> > are only now able to move our focus to e4, just in time for there to
> > be no time.
> >
> > My specific suggestion is to eliminate RC3 and RC4, moving the two
> > weeks to the front, so M4 in +2 weeks, etc.  That should give us
> > some period of stabilization to ensure say we don't bust the demos
> > in the 11th hour, but still provide some runway to do new work.
> >
> > I am open to other suggestions.  Your thoughts?
> >
> > Kevin
> >
> >
>
> >
> > Paul Webster <pwebster@xxxxxxxxxxxxxxxxxxx>
> > Sent by: e4-dev-bounces@xxxxxxxxxxx
> > 06/08/2009 01:08 PM
> >
> > Please respond to
> > E4 Project developer mailing list <e4-dev@xxxxxxxxxxx>
> >
> > To
> >
> > E4 Project developer mailing list <e4-dev@xxxxxxxxxxx>
> >
> > cc
> >
> > Subject
> >
> > [e4-dev] [releng] Next week is 0.9 M4 week
> >
> >
> >
> >
> > http://www.eclipse.org/projects/project-plan.php?projectid=eclipse.e4
> >
> > Since we are approaching our 0.9 M4 (feature freeze) next week and I
> > have platform downloads for win32, linux gtk, and macosx cocoa (all
> > x86) I've started I builds every night.  Because they are I-builds you
> > will need to release changes to see them in the nightly build:
> > http://wiki.eclipse.org/E4/Builds
> >
> > I'll be updating our builds to comply with
> > http://wiki.eclipse.
> > org/Development_Resources/HOWTO/Conforming_Incubation_Branding.
> > I'll try to announce any changes on the e4-dev@xxxxxxxxxxx mailing
> > list.
> >
> > I'll be posting a couple of updates and reminders over the next 2
> > weeks.   It's important that we act on them sooner, rather than later
> > so we are in good shape for next week.
> >
> > PW
> >
> >
> > --
> > Paul Webster
> > Hi floor.  Make me a sammich! - GIR
> > _______________________________________________
> > e4-dev mailing list
> > e4-dev@xxxxxxxxxxx
> > https://dev.eclipse.org/mailman/listinfo/e4-dev
> > _______________________________________________
> > e4-dev mailing list
> > e4-dev@xxxxxxxxxxx
> > https://dev.eclipse.org/mailman/listinfo/e4-dev
> _______________________________________________
> e4-dev mailing list
> e4-dev@xxxxxxxxxxx
> https://dev.eclipse.org/mailman/listinfo/e4-dev
> _______________________________________________
> e4-dev mailing list
> e4-dev@xxxxxxxxxxx
> https://dev.eclipse.org/mailman/listinfo/e4-dev
> _______________________________________________
> e4-dev mailing list
> e4-dev@xxxxxxxxxxx
> https://dev.eclipse.org/mailman/listinfo/e4-dev


Back to the top