[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
Re: [nebula-dev] Nebula current actions
|
Hi Tom,
1. Nightly Builds:
------------------
A *big big* thank you for investing the time to get this up and
running!
There's one small I'd like to request. Could you please move the
gallery.releng-Project into the releng-Folder so that the releng
projects are not next to real code (Grid and CDatetime are already
located in there).
Yes, I planed to do so, but as I state this plugin as an example with
location in the how to, I didn't want to move it silently.
So everyone, be warned, this plug-in will be moved soon :-)
2. Project Plan:
----------------
Indeed this is a important. We need to have stricter planing, ... .
I'll
send out a mail hopefully later today how I'd like Nebula to work in
future.
Yes, the planing is important, but before that, I think that it's
important to show what we plan to do with each widget : add features,
fix a long-standing bug, ... . The project plan is an automated way
to get a nice view of bugzilla.
Once this is done, we can then work on a planning :-)
On the other topics, I'll probably need your vote on some bugs to get
things speed up (hosting for jnlp, ...). I'll make the list asap.
--
Nicolas
Thanks
Tom
Nicolas Richeton schrieb:
Hi all,
I've made the list of the current issues requiring committer action.
This is on wiki : http://wiki.eclipse.org/Nebula_Actions . I'll add
some links to bugzilla items and previous mails when I get some
free time.
Most of them can be done very quickly. I've already done all of
this for
the gallery widget so feel free to ask for help.
If something requires additionnal informations, just edit the page.
I pasted the content of the wiki page here for your convenience :
Nighlty builds
We are ready to provide nighlty build for every widget. We just need
that every committer creates a releng plugin for his widgets. This
can
be done very quickly (say 10 minutes). Read instructions here [[1]]
Question : the zip files contains "-incubation". Is it enough or do
we
need to change something else ?
Project plan
We have to provide a project plan. Aside from release planning, each
widget have to provide links to committed, proposed and deferred
bugzilla items. In order to do this, you need to :
- Add 3 bugzilla search urls to nebula-project-plan.xml
- Add keyword 'plan' to your major bugzilla items and update
priorities.
For Gallery : P1 = committed, P2/P3 : proposed, P4/P5 : deferred
This can be done in 30 minutes.
IP Log
We have to provide an IP log. It automatically generated from bugs
attachements having the flag iplog+. We just have to dig bugzilla for
patch which were applied to the code and add this flag.
Examples
We are very close to provide an offical Webstart example of Nebula
widgets, but only 4 widgets currently have their example tab. It is
very
easy to turn a snippet to an example tab, but if you have some more
free
time, show your widget at its best.
A bug have been logged for each missing widget. (include bug # here)
Ohloh (Bonus)
The CVS history of Nebula is analysed by ohloh :
http://www.ohloh.net/p/5650. If each committer adds its name, photo
and
location, this would provide some nice informations and stats. :)
_______________________________________________
nebula-dev mailing list
nebula-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/nebula-dev
--
Nicolas Richeton
nicolas.richeton@xxxxxxxxx