Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[cross-project-issues-dev] Neon.1 RC2 staging repository is complete. One caution about WindowBuilder


It appears everyone got in their RC2 contributions despite the DNS issues (since I have not heard otherwise),

so I have turned off the aggregation jobs so the EPP packages can be created and give a few days of a non-changing staging/neon repository for testing.

= = = = = = = =

My caution about WindowBuilder is the same as I mentioned last week in Bug 498276.

https://bugs.eclipse.org/bugs/show_bug.cgi?id=498276#c5

As I understand it, from a post to this mailing list, version 1.9.0 is planned to be contributed to both Neon.1, but it appears the version in Neon.1 staging is still 1.8.x.

Please correct me if I have misunderstood something. But, if not, I am concerned that WindowBuilder is still not meeting the requirements of being in the Simultaneous Release. This is "RC2" after all and it does not appear WB is providing a _Release Candidate_ and not actively participating.

If the issue is not clarified or corrected promptly I'll propose that WB be pulled before RC3.

= = = = = = = =

Thanks to all for your efforts to improve quality and provide new features for Neon.1. 



Back to the top