Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [cross-project-issues-dev] Concluding SR2 RC1 warm-up repository

Adding some more URLs:

Packages for testing:
http://build.eclipse.org/technology/epp/epp_build/juno/download/20130116-1805/

p2 repository with the data for the packages:
http://build.eclipse.org/technology/epp/epp_build/juno/download/20130116-1805/repository/

Thanks,
Markus

On Thu, Jan 17, 2013 at 3:33 PM, David M Williams <david_williams@xxxxxxxxxx> wrote:
Sorry, fell asleep last night :) when I should have been sending out this notice.

But, we are done with SR2 RC1 warm-up repo.

Remember its "staging" location is
http://download.eclipse.org/releases/maintenance/

Besides testing that repo, be sure to check the repository reports ... looks like a few regressions for required files, signed jars, etc.
http://build.eclipse.org/simrel/juno/reporeports/

In addition to testing only that single repo, be sure to test it as a "composite", since eventually it will be added to .../releases/juno
as a child repository. See
http://wiki.eclipse.org/SimRel/Simultaneous_Release_FAQ#Test_staging_as_a_pseudo_composite
Don't forget to test "update" scenarios (some of which need to wait for EPP repositories to be ready, if they are not already).

Recall that there is no "promotion" of this repo. It will simply be "left alone" for about a week ... until Juno SR2 RC2 +0.
http://wiki.eclipse.org/Juno/Simultaneous_Release_Plan#SR2

As a "warm-up", we don't expect this to be a true "release candidate", but please approach RC2, RC3, etc., with the attitude that those will be true "release candidates" suitable for adopter acceptance testing, etc.

Thanks,


_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev




Back to the top