Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[cross-project-issues-dev] Moving to ICU4J 4.6 with a BREE of J2SE-1.5

We are looking to move the com.ibm.icu plugin's BREE to J2SE-1.5 (from
Foundation-1.0/J2SE-1.4) in Eclipse 3.7, and move up to ICU4J 4.6 or
4.8 (schedule permitting) at the same time.

Right now we consume a version of ICU4J  4.2.1 that has been
conditionally compiled for us and runs on Foundation 1.0.  As of ICU4J
4.4 they opened up their API and internals to use java 1.5 language
features and libraries, and for us to be able to pick up current
versions of ICU4J we need to allow com.ibm.icu to move up to J2SE-1.5.

This will not require *consumers* of com.ibm.icu to change their BREEs
unless they need to use new 1.5 APIs (ex: org.eclipse.ui.workbench
still has a BREE of J2SE-1.4).  The requirement that no one specifies
a maximum version range for com.ibm.icu still applies.

See https://bugs.eclipse.org/bugs/show_bug.cgi?id=324782

-- 
Paul Webster
Hi floor.  Make me a sammich! - GIR


Back to the top