Ok, let's say we are done with the staging phase. GMF and STP did get back in the build and have been promoted to 'staging'. Please test staging, a little, to make sure there are no blocking ("stop ship") problems. Remember, it is not mirrored, so do not publish, do not use for normal installs ... just surface testing.

There is a build running now, but I'm 99.99% sure it will fail, based on my local runs, the build file has remained unchanged since M2,  and I've heard no word from that project. (emft-ecoretools). So I'm assuming they've dropped out or merged. See bug 297654
https://bugs.eclipse.org/bugs/show_bug.cgi?id=297654
But, in the unlikely event this build succeeds, I'll back peddle in the morning. Well, later in the morning. :)

Next steps: Thursday EPP packages are made and sanity checked.
            Thursday evening-ish I'll produce the monotonic, incrementally staged composite release repo, and then on Friday, 9 ish, or noon ish, once I see a number of mirrors, I'll "flip the bit" so the composite content file points to them all (instead of only the existing previous two milestones).

Whew, wears me out just typing it all out! :)

Thanks all.