[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
[cross-project-issues-dev] Day 3+ Status and Staging
|
So close.
A number of big issues were fixed in the two days, but, one small issue is
not quite done, so I am not ready to declare M7 done.
There's a last step needed to fix a mysteriously corrupted pack.gz file.
See bug 275150.
https://bugs.eclipse.org/bugs/show_bug.cgi?id=275150
Any release engineers from Modeling up late?
If not, I'm sure it'll be fixed first thing on Friday.
I have updated 'staging' with the very latest ... which has more content
than ever before. ECF+2 is in, STP is in, xpand is in. All projects are
in, except for swordfish, which has a problem with MD5 checksums that has
turned out to be fairly common problem. We all learn so much going through
this. See bug 275094.
https://bugs.eclipse.org/bugs/show_bug.cgi?id=275094
So, outlook is good for Friday We still expect to be on target for Monday
...
every good plan should have a little buffer built in.