Maintenance Release Test Plan - 3.1.1 RC2


Goal

The goal of this test pass is to achieve full coverage of the SDK to get a good overall picture on the state of the build. A full day of testing is scheduled for Monday, September 26, 2005.

Checklist

Please see the full test plan first.

Here is a checklist of the things to verify during the test pass. Every tester should try to verify all of the items in this list.

Platforms

The following are the platform assignments for the test pass. Please try use the listed platform for all parts of the test pass.

Linux GTK+Douglas Pollock
Linux MotifMichael Van Meekeren
MacOS XKim Horne
Solaris MotifPaul Webster
Windows 2000Nick Edgar
Windows XPTod Creasey (Arabic), Karice McIntyre (Chinese), Eric Moffatt (dual monitor)