3.3 M2 Test Plan
Goal
The goal of this test pass is to achieve full coverage of the SDK to get a
good overall picture on the state of the build. A full day of testing is scheduled
for Tuesday, October 31, 2006.
Checklist
- Trim. Test the new trim support especially if you are not on Windows
- Common Navigator. General testing
- Undo/Redo in the resource navigator
- Field Assist Watch for layout issues
- Viewers general regressions
- Filtered Tree
- Open Resource Dialog. Focus on concurrency problems particularly
- Preferences Make sure preferences are restored on startup
- Verify. Verify bugs assigned to you that have been fixed
during 3.3 M3.
- Watch your log. Make sure nothing is getting into the .log that
indicated a real issue.
- Component Testing. Test every component area assigned to you on
the component area test plan.
Platforms
The following are the platform assignments for the test pass. Please
try use the listed platform for all parts of the test pass.
| Linux GTK+ |
Paul Webster, Kryzstof Michalski |
| Vista |
Tod Creasey |
| Linux Motif |
Aaron Ferguson |
| MacOS X |
Kim Horne |
| Windows XP |
Karice McIntyre(NL),Boris Bokowski, Michael Elder, Susan Franklin, Szymon
Brandys |