[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[Newsgroup Home]
|
[news.eclipse.tools.ve] Re: VE development plan
|
Hi Yves
We are very pleased to hear about the Visual Editor?s come-back!
We are building a BPM Platform based on eclipse and the Visual Editor. To
be exact, we use the ULC Visual editor extension of canoo witch is based
on the Visual Editor. Our tool, the Xpert.ivy Designer 4.x, enables you
also, to compose visually our user interface panels.
For this purpose we use the Visual Editor, witch is fully integrated into
our product.
You asked for the most important features. Here is a list of the most
important Visual Editor features in our point of view.
1. Stability: the VE crashes at the moment too often. It is very hard to
find the reasons for the crashes. We think that it has to do with the
synchronisation of the models, or it is a problem with the proxy
factories. Once the VE is corrupted, one has to clean all the VE caches
manually, in order to get the VE back to business.
2. Performance: the time until a panel is opened is too long. Users have
the feeling, that something went wrong. The time after dropping a widget
until the VE response again to user input, is also very too long.
3. It would be very handy, if there is a extension point to hook in while
the widget dropping onto the VE, in order to show a own window where the
user can enter some properties.
4. Bug - if you have two panels open in the VE, and the first one is
embedded in the second one. Then alter both of them, a error occurs.
Could you please send me your comment about our priority list?
Thanks in advance,
Alain.
Alain Helfenstein
dipl.Ing. FH in Informatik
ivyTeam AG
Alpenstrasse 9
6300 Zug
Telefon: +41 (0)41 726 07 91
Zentrale: +41 (0)41 710 80 20
Fax: +41 (0)41 710 80 60
email: alain.helfenstein@xxxxxxxxxx
Web: www.soreco.ch