Re: [wtp-dev] WTP M4 Shutdown Plan


Neil, we can quickly discuss Dali and DTP in the status call tommorrow.

Thanks,

John Lanuti
IBM Web Tools Platform Technical Lead, IBM Rational
IBM Software Lab - Research Triangle Park, NC
jlanuti@xxxxxxxxxx
t/l 441-7861



Neil Hauge <neil.hauge@xxxxxxxxxx>
Sent by: wtp-dev-bounces@xxxxxxxxxxx

12/05/2006 04:27 PM

Please respond to
neil.hauge@xxxxxxxxxx; Please respond to
"General discussion of project-wide or architectural issues."        <wtp-dev@xxxxxxxxxxx>

To
"General discussion of project-wide or architectural issues." <wtp-dev@xxxxxxxxxxx>
cc
Subject
Re: [wtp-dev] WTP M4 Shutdown Plan





John,

The Dali JPA project has dependencies on EMF, and will be in-line with what greater WTP is doing (with the step up to EMF M4) on the 15th..  I was thinking that something similar could be done with the DTP dependency.  I think that Dali JPA could still be a part of the declared WTP M4 on the 22nd in this scenario with no need to declare unofficially.  That said, I am new to this game, so I might be missing something.

As a side note, DTP 1.0 appears to be dependent on EMF 2.2.1.  DTP isn't quite on the Europa track yet , but this doesn't appear to have caused any problems so far.

Neil

John Lanuti wrote:


Hi Neil,


Ok, that sounds fine.  Do you have dependencies on EMF and if so, will you be on EMF M4 for your DTP 1.0?  If not, I guess we can leave our WTP M4 declaration "unofficial" until you guys have had a chance to step up to EMF M4.


I'm guessing JSF and ATF may have their own schedules as well this go round.


Thanks for the heads up,


John Lanuti
IBM Web Tools Platform Technical Lead, IBM Rational
IBM Software Lab - Research Triangle Park, NC

jlanuti@xxxxxxxxxx
t/l 441-7861



Neil Hauge <neil.hauge@xxxxxxxxxx>
Sent by:
wtp-dev-bounces@xxxxxxxxxxx

12/05/2006 03:23 PM

Please respond to
neil.hauge@xxxxxxxxxx; Please respond to
"General discussion of project-wide or architectural issues."        
<wtp-dev@xxxxxxxxxxx>


To
"General discussion of project-wide or architectural issues." <wtp-dev@xxxxxxxxxxx>
cc
Subject
Re: [wtp-dev] WTP M4 Shutdown Plan







Hi John,

Just a heads up that DTP 1.0 is planned for general availability on the 22nd.  I assume we would still want to use this for our M4, but I'm not sure if there are any logistical issues that would be problematic.  Here is a link to their end game plan for 1.0 -
http://www.eclipse.org/datatools/pmc/endgame_plans/dtp_1.0/DTP%201.0%20Endgame%20Plan.htm.

Neil



John Lanuti wrote:


Hey guys,


As determined in the status call last week, there was an overwhelming interest in shifting our M4 dates from January to late December.  To this end, here is a reworked proposal for M4 shutdown.  Please read and review and provide any feedback or suggestions and we can come to a concensus in the meeting on Thursday.
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
03 04

05 06 07

Smoke Tests

Status Call
08

1.5.3 M Build

2.0 I Build
09
10 11
Step up to Platform M4 candidate
12 13 14

Smoke Tests

Status Call
15
1.5.3 M Build

(Platform M4)

2.0 I Build

Step up EMF/Platform
16
17 18

Verifications/

Function Test 2.0
19

Compatibility Test 2.0
20

Fix and M4 Build
21

Smoke Tests

Status Call
22
1.5.3 M Build

(EMF M4)

Step up EMF

WTP M4
23

Break until 2007- Happy Holidays!




Things to note:


WTP 1.5.3

We will continue with 1.5.3 Maintenance builds as usual.


WTP 2.0

The platform M4 is on Friday December 15th, so we will step up on Monday 11th to provide any feedback before moving up to the official M4 on Friday Dec 15th.

EMF M4 is on Friday December 22nd, so we will step on Friday Dec 15th so we have it for the following week's tests.  We will slip in the EMF official M4 on Dec 22 when we declare our M4.


Test

Two day test pass on Monday Dec 18th and Tuesday Dec 19th.  First day consisting of any defect verifications and all functional tests.  The second day would be any remaining functional tests and the creation/execution of compatibility scenarios for WTP 1.5->2.0 and WTP 2.0->1.5.  This leaves us Wednesday to fix any major or blocking bugs and to spin a WTP 2.0 M4 candidate to smoke test the following day.


Post Dec 22

We will not leave the possibility of adding any defect fixes after Dec 22 into WTP M4 even though the official Europa date is January 5th.


Thanks,


John Lanuti
IBM Web Tools Platform Technical Lead, IBM Rational
IBM Software Lab - Research Triangle Park, NC

jlanuti@xxxxxxxxxx
t/l 441-7861




_______________________________________________
wtp-dev mailing list

wtp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/wtp-dev
_______________________________________________
wtp-dev mailing list

wtp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/wtp-dev




_______________________________________________
wtp-dev mailing list
wtp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/wtp-dev
 
_______________________________________________
wtp-dev mailing list
wtp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/wtp-dev


Back to the top