[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
[wtp-dev] Agenda of the WTP Status Telecon, 2006-09-21
|
Dail-in numbers
USA: 1-210-795-1100
Toll Free: 866-880-0098
Participant passcode: 5433170
1. WTP 1.5.1 Status
http://wiki.eclipse.org/index.php/WTP_Release_1.5.x_Maintenance_Plan_and_Policies#Major_Dates
9/15: Code freeze for WTP 1.5.1 and start of downstream projects’ (TPTP,
e.g.) final readiness and verification cycle. (Any requested changes or
P1 bugs discovered required PMC approval to fix.)
9/15: Date by which all Callisto projects
are maintenance build ready and update site loading/testing can commence.
9/21 <-- You are here
9/27: Final posting of Callisto bits
and mirror synchronization; update site locked during this time.
9/29: GA for first Callisto maintenance
pack (including base 3.2.1 and WTP 1.5.1). Callisto update site, WTP update
site, and WTP download page all available.(including all-in-one bundles
for WTP 1.5.1).
2.1 Bugs pending PMC
approval
http://www.eclipse.org/webtools/plans/1.5.1/pmc-bug-approval.php
2.2 Bugs targeted to
1.5.1
https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=&query_format=report-table&classification=WebTools&product=Web+Tools&target_milestone=1.5.1+M151&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&format=table&action="">
2.3 Untargeted Blocker
and Critical Bugs
https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Web+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&priority=P1&priority=P2&priority=P3&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=
2.7 Bugs waiting to
be verified
Component Leads: Please get blockers and critical
verified
https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=reporter&z_axis_field=&query_format=report-table&classification=WebTools&product=Web+Tools&bug_status=RESOLVED&format=table&action=""
3. Monday and Tuesday:
Test WTP daze
Full
Regression tests
Especially
retest all main paths, most important functions
Verify
most defects in verify state (don't wait for originator)
verify
ALL blocker, critical
verify
most major (half of 536?)
verify
others if easy/obvious
Windows
and Linux
Focus
testing with 1.5 JRE ... er, with the IBM JRE :)
[really,
just kidding, Sun too. others?]
Need
up/down vote by EOD Tuesday (26th) to confirm "ship" on 27th
(actually
released on 29th)
4. WTP 2.0 Status
what is WTP
2.0?
9/26 initial PMC review,
9/29
component lead input;
10/4
public planning call;
10/17
2.0 initial plan publication.
5. wtp-releng build
notifications
Reminder for
committers to send me cvs id and email address (to get
notified directly by cruise control)
subscribe to RSS feed for all notifications
6. Other Business?