[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
[wtp-dev] Minutes of the WTP Status Telecon, 2006-08-17
|
See WTP Status Telecons [1] for more
information.
[1] http://eclipse.org/webtools/development/status-telecons/index.html
Attendees
Amy Wu
Chuck Bridgham
David Williams
Jeffrey Liu
John Lanuti
Kathy Chan
Keith Chong
Konstantin Komissarchik
Larry Dunnell
Lawrence Mandel
Nitin Dahyabhai
Rob Frost
Steve Francisco
Tim Deboer
Ted Bashor
1. WTP 1.5.1 Status - David Williams
http://wiki.eclipse.org/index.php/WTP_Release_1.5.x_Maintenance_Plan_and_Policies#Major_Dates
8/15 Deadline for "Hot
bugs" to be proposed
from adopters for inclusion in 1.5.1. Subsequent requests will apply to
WTP 1.5.2.
8/30: RC3 (final?) for platform 3.2.1
[See the platform’s endgame plan for more details]
9/01: Component lead triage begins. All
bugs reviewed and targeted accordingly; most P3 and low sev bugs not yet
addressed that are nontrivial should be pushed out of the 1.5.1 release.
9/08: WTP 1.5.1 code complete. Start
of PMC-level triage.
9/15: Code freeze for WTP 1.5.1 and start
of downstream projects’ (TPTP, e.g.) final readiness and verification
cycle. (Any requested changes or P1 bugs discovered required PMC approval
to fix.)
9/15: Date by which all Callisto projects
are maintenance build ready and update site loading/testing can commence.
9/27: Final posting of Callisto bits
and mirror synchronization; update site locked during this time.
9/29: GA for first Callisto maintenance
pack (including base 3.2.1 and WTP 1.5.1). Callisto update site, WTP update
site, and WTP download page all available.(including all-in-one bundles
for WTP 1.5.1).
1Q 2007 1.5.2 (as part of the 2nd Callisto
joint maintenance release)
David - 09/08 PMC-level triage, to request
for approval, add the PMC keyword to bugzilla.
1.1 Hot Bugs [1] - Jeffrey
Liu
[1] https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=%5Bhotbug%5D&classification=WebTools&product=Web%20Tools&target_milestone=1.5.1%20M151&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED
1.2 Hot Bugs Requests [1] - Jeffrey Liu
[1] https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=%5Bhotbug_request%5D&classification=WebTools&product=Web%20Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED
2. WTP 2.0 Status - David Williams
David - Still having
build problems with pre-req ranges.
2.1 Update Pre-req ranges - David Williams
As of the last email from David, the following bundles have yet to update
their pre-req ranges
org.eclipse.jst.j2ee.ejb.annotation.model
org.eclipse.jst.j2ee.ejb.annotations.emitter
org.eclipse.jst.j2ee.ejb.annotations.ui
org.eclipse.jst.j2ee.ejb.annotations.xdoclet
org.eclipse.jst.server.generic.core
org.eclipse.jst.server.generic.ui
org.eclipse.jst.server.websphere.core
org.eclipse.jst.ws.axis.consumption.core
org.eclipse.jst.ws.axis.consumption.ui
org.eclipse.jst.ws.axis.creation.ui
org.eclipse.jst.ws.consumption.ui
org.eclipse.jst.ws.consumption
org.eclipse.jst.ws.creation.ui
org.eclipse.jst.ws.uddiregistry
org.eclipse.jst.ws.ui
org.eclipse.jst.ws
org.eclipse.wst.command.env.ui
org.eclipse.wst.common.explorer
org.eclipse.wst.internet.proxy
org.eclipse.wst.ws.explorer
org.eclipse.wst.ws.ui
Kathy - Chris is looking at updating
the pre-req ranges.
David - Still pushing to have our first
milestone declared on 08/21.
3. Performance [1] - Jeffrey Liu
We will review all performance bugs that are at least major or P2, bug
owners, please be prepared.
[1] https://bugs.eclipse.org/bugs/buglist.cgi?classification=WebTools&product=Web+Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&field0-0-0=keywords&type0-0-0=anywordssubstr&value0-0-0=Performance+performance&field0-0-1=short_desc&type0-0-1=anywordssubstr&value0-0-1=Performance%3A+performance%3A+%5BPerf+%5Bperf+Performance+performance&field1-0-0=bug_severity&type1-0-0=anywordssubstr&value1-0-0=blocker+critical+major&field1-0-1=priority&type1-0-1=anywordssubstr&value1-0-1=P1+P2
4. Other Business - Open
None.
Jeffrey Liu
IBM Rational Software
IBM Toronto Lab.
8200 Warden Ave. Markham, Ontario, L6G 1C7
Internal mail: D3/UMZ/8200/MKM (D3-268)
T/L: 969 3531
Tel: (905) 413 3531
Fax: (905) 413 4920
jeffliu@xxxxxxxxxx