Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[wtp-dev] Minutes of the WTP Status Telecon, 2006-08-17


See WTP Status Telecons [1] for more information.

[1] http://eclipse.org/webtools/development/status-telecons/index.html


Attendees

Amy Wu
Chuck Bridgham

David Williams

Jeffrey Liu

John Lanuti

Kathy Chan

Keith Chong
Konstantin Komissarchik
Larry Dunnell

Lawrence Mandel

Nitin Dahyabhai

Rob Frost
Steve Francisco
Tim Deboer
Ted Bashor

1. WTP 1.5.1 Status - David Williams


http://wiki.eclipse.org/index.php/WTP_Release_1.5.x_Maintenance_Plan_and_Policies#Major_Dates


8/15 Deadline for
"Hot bugs" to be proposed from adopters for inclusion in 1.5.1. Subsequent requests will apply to WTP 1.5.2.

8/30: RC3 (final?) for platform 3.2.1 [See the platform’s endgame plan for more details]

9/01: Component lead triage begins. All bugs reviewed and targeted accordingly; most P3 and low sev bugs not yet addressed that are nontrivial should be pushed out of the 1.5.1 release.

9/08: WTP 1.5.1 code complete. Start of PMC-level triage.

9/15: Code freeze for WTP 1.5.1 and start of downstream projects’ (TPTP, e.g.) final readiness and verification cycle. (Any requested changes or P1 bugs discovered required PMC approval to fix.)

9/15: Date by which all Callisto projects are maintenance build ready and update site loading/testing can commence.

9/27: Final posting of Callisto bits and mirror synchronization; update site locked during this time.

9/29: GA for first Callisto maintenance pack (including base 3.2.1 and WTP 1.5.1). Callisto update site, WTP update site, and WTP download page all available.(including all-in-one bundles for WTP 1.5.1).

1Q 2007 1.5.2 (as part of the 2nd Callisto joint maintenance release)

David - 09/08 PMC-level triage, to request for approval, add the PMC keyword to bugzilla.

1.1 Hot Bugs [1] - Jeffrey Liu

[1] https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=%5Bhotbug%5D&classification=WebTools&product=Web%20Tools&target_milestone=1.5.1%20M151&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED


1.2 Hot Bugs Requests [1] - Jeffrey Liu


[1] https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=%5Bhotbug_request%5D&classification=WebTools&product=Web%20Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED


2. WTP 2.0 Status - David Williams

David - Still having build problems with pre-req ranges.

2.1 Update Pre-req ranges - David Williams


As of the last email from David, the following bundles have yet to update their pre-req ranges


org.eclipse.jst.j2ee.ejb.annotation.model

org.eclipse.jst.j2ee.ejb.annotations.emitter

org.eclipse.jst.j2ee.ejb.annotations.ui

org.eclipse.jst.j2ee.ejb.annotations.xdoclet

org.eclipse.jst.server.generic.core

org.eclipse.jst.server.generic.ui

org.eclipse.jst.server.websphere.core

org.eclipse.jst.ws.axis.consumption.core

org.eclipse.jst.ws.axis.consumption.ui

org.eclipse.jst.ws.axis.creation.ui

org.eclipse.jst.ws.consumption.ui

org.eclipse.jst.ws.consumption

org.eclipse.jst.ws.creation.ui

org.eclipse.jst.ws.uddiregistry

org.eclipse.jst.ws.ui

org.eclipse.jst.ws

org.eclipse.wst.command.env.ui

org.eclipse.wst.common.explorer

org.eclipse.wst.internet.proxy

org.eclipse.wst.ws.explorer

org.eclipse.wst.ws.ui

Kathy - Chris is looking at updating the pre-req ranges.

David - Still pushing to have our first milestone declared on 08/21.

3. Performance [1] - Jeffrey Liu


We will review all performance bugs that are at least major or P2, bug owners, please be prepared.


[1] https://bugs.eclipse.org/bugs/buglist.cgi?classification=WebTools&product=Web+Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&field0-0-0=keywords&type0-0-0=anywordssubstr&value0-0-0=Performance+performance&field0-0-1=short_desc&type0-0-1=anywordssubstr&value0-0-1=Performance%3A+performance%3A+%5BPerf+%5Bperf+Performance+performance&field1-0-0=bug_severity&type1-0-0=anywordssubstr&value1-0-0=blocker+critical+major&field1-0-1=priority&type1-0-1=anywordssubstr&value1-0-1=P1+P2


4. Other Business - Open

None.

Jeffrey Liu
IBM Rational Software
IBM Toronto Lab.
8200 Warden Ave. Markham, Ontario, L6G 1C7
Internal mail: D3/UMZ/8200/MKM (D3-268)
T/L: 969 3531
Tel: (905) 413 3531
Fax: (905) 413 4920
jeffliu@xxxxxxxxxx


Back to the top