Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [wtp-dev] POLL: 3.0 or 3.1

Naci Dai wrote:

Please voice your opinions on the subject:


WTP release will be for Eclipse 3.1, so eventually we have to move to 3.1. The question not if but when.

3.0 Pros
- 3.0.x stream i stsable and beaing used in production - It will provide an immediate test bed since there are many installed.

3.0 Cons
- Delayed integration with 3.1, missing the potential to create requirements for 3.1 development steram

3.1 Pros
- Early and greadual integration with new Eclispe features

3.1 Cons
- Working with a changing code base.

My Suggestion is WTP 1.0M2 (Released Dec 15) should be based on Eclipse 3.1M3 (Released Nov5). Eclipse 3.1M4 is released two days after (Dec 17) so this creates a potential problem with immediately becoming outdated. Ideally we should lag Eclipse releases by a week or so, but December is problematic due to Holidays.

To quote Erich Gama : "we freeze development 3-4 days before a milestone. However, when a milestone requires a critical fix which depends on an API change then we will make the API change."

Without critical bug, we can rely on few days to ensure WTP compatibility with Eclipse 3.1M4. WTP M2 could be Dec 22, for example. Doable but hot stuff :-)

For other WTP milestones, it is best to have a week of distance. Then, we have to adopt the 6 weeks milestones rythm of Eclipse 3.1. WTP milestones distance is currently 8 weeks.

Dominique



Naci Dai,
Managing Director

eteration a.s.
Inonu cad. Sumer sok. Zitas D1-15
Kozyatagi, Istanbul 81090
+90 (532) 573 7783 (cell)
+90 (216) 361 5434 (phone)
+90 (216) 361 2034 (fax)
http://www.eteration.com
mailto:nacidai@xxxxxxx
mailto:naci@xxxxxxxxxxxxx



_______________________________________________
wtp-dev mailing list
wtp-dev@xxxxxxxxxxx
http://dev.eclipse.org/mailman/listinfo/wtp-dev




Back to the top