Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[virgo-dev] Re: [rt-pmc] [Fwd: Re: Distributing Milestones without CQs?]

The IP Team has approved parallel IP check-in, so you're good to go.

Thanks,

Wayne

Jeff McAffer wrote:
These likely just got lost in the shuffle.  I approved the three CQs noted.

Jeff



On 2010-08-11, at 2:26 PM, Wayne Beaton wrote:

Hi Virgo committers

I've noticed that your 2.1.0 milestone build [1] contains a library that should probably not be there.  Specifically, the CQ for SLF4J 1.6.1 [2] has not yet been approved by the PMC. Further, a recent blog post [3] suggests that Logback 0.9.24 is included in the distro (I don't see it); again, those CQs [4,5] have not been approved by the PMC.

Once these CQs have been approved by the PMC, they may be eligible for Parallel IP. At that point, you can include them in your milestone builds.

In the meantime, I must ask that you remove these libraries from your downloads. Or, is there something that I've missed?

Thanks for your attention in this matter.

Wayne

[1] /virgo/milestone/VWS/2.1.0.M03-incubation/virgo-web-server-2.1.0.M03-incubation.zip
[2] https://dev.eclipse.org/ipzilla/show_bug.cgi?id=4377
[3] http://blog.springsource.com/2010/08/10/virgo-milestone-m03-ships/
[4] https://dev.eclipse.org/ipzilla/show_bug.cgi?id=4375
[5] https://dev.eclipse.org/ipzilla/show_bug.cgi?id=4376

--
Wayne Beaton, The Eclipse Foundation
http://www.eclipse.org
--
Join me at Eclipse Summit Europe 2010!
http://eclipsesummit.org/

_______________________________________________
rt-pmc mailing list
rt-pmc@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/rt-pmc

_______________________________________________
rt-pmc mailing list
rt-pmc@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/rt-pmc

--
Wayne Beaton, The Eclipse Foundation
http://www.eclipse.org
--
Join me at Eclipse Summit Europe 2010!
http://eclipsesummit.org/



Back to the top