Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[tm-dev] timing of tm hudson build jobs

Our tm-master-nightly job polls git every 6 hours. This seems like an awfully long time to me for continuous integration. I'd like to take this down to 1 hour. Are there any objections to doing so? Is there another preferred method of scheduling other than an SCM poll?

Once a build is triggered it seems to run about 30 minutes.

-- David Dykstal,  Architect - Rational Developer for Power Systems

Back to the top