Re: [rt-pmc] Vert.x 2.1.0 release

I should caveat that first statement before someone goes off on it,
you can build against the dependencies in maven central so long as
they are vetted through the IP process....the jetty dependencies we
use from maven central we have IP cleared based on the source and
binaries files in the respective maven artifact, we have then
typically followed up and got that goop shoved into orbit

jesse
--
jesse mcconnell
jesse.mcconnell@xxxxxxxxx


On Wed, Mar 12, 2014 at 10:30 AM, Jesse McConnell
<jesse.mcconnell@xxxxxxxxx> wrote:
>>
>>
>> AIUI Vert.x is an Eclipse project and we consume artifacts from Maven
>> Central as part of our build. Is this wrong? All the dependencies have been
>> IP checked so I don't see why this is an issue.
>>
>
>
> You can not take a maven dependency from the build and push it into a p2
> repository...but you can build against them all you like because that isn't
> a release in the traditional Eclipse sense.  An 'Eclipse Release' is a p2
> repository, and if that repository is going to be consumed by anything going
> into the release train (like equinox uses Jetty) the contents of that
> repository need to be signed.  If you are providing a repository with
> dependencies inside (like say a servlet api version) then you need to
> consume a servlet api from Eclipse Orbit that has gone through the whole CQ
> process.  There is a tacit expectation that if you are producing a P2
> repository you will be nice and make sure that everything is in Orbit that
> is a dependency but AFAIK that is not a strict requirement.
>
>>
>>
>> Well.. this is the thing. The way we do releases is we try to do a release
>> every 4-6 weeks. There are no "special themes" for releases. It just
>> contains the next lot of stuff that is on the TODO list, which can be seen
>> in Bugzilla. Some weeks we might two releases in a week.
>>
>> The only way we can continue that model right now in the Eclipse process
>> is to call each of those releases a "milestone" so we can fly under the
>> radar, but to me a milestone release is really no different to a "proper"
>> release.
>>
>
> assuming X.Y.Z.identifier versioning which is recommended by eclipse for
> osgi purposes
>
> You can release all the Z.identifiers you like as releases so long as the
> dependencies (and thus the IP log have not changed)...if you change
> dependency versions you need to bump the IP log and we typically make that a
> new minor release.
>
> X.Y versions require a release review
>
> cheers,
> jesse
>