Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [rt-pmc] Vert.x 2.1.0 release

Put your projects downloads on download.eclipse.org. We can help you sort out how to do that if you need assistance.

They can be distributed via bintray as well.

Wayne

On 02/26/2014 04:29 AM, Tim Fox wrote:
On 18/02/14 21:38, Wayne Beaton wrote:
The IP Log generator update is complete.

http://www.eclipse.org/projects/ip_log.php?id=rt.vertx

More information is here:

https://wiki.eclipse.org/Development_Resources/Automatic_IP_Log

The other thing that we need to see before we can approve the IP Log is actual downloads from the project. At present, the Vert.x downloads area is empty.

Wayne, we currently use bintray for downloads - how do you suggest we proceeed here?


Wayne


On 02/18/2014 01:45 PM, Wayne Beaton wrote:
Hi Tim.

The plan is one bookend of the release cycle [1]. The plan (at least a rudimentary "this is sort of what we're thinking that we'd like to do with the release" plan should be in place at the beginning of release development. The plan can evolve over time. It is a means by which the community can prepare for and participate in the release; it's a basis upon which adopters can form their own release plans.

At the end of the release cycle, you need to complete the review information. This is generally a retrospective "this is what we did" sort of thing with some focus on ensuring that necessary quality exists in the code and that all aspects of open source development have been observed (i.e. the open source rules of engagement).

The review also serves as a checkpoint for the IP process.

So... please do the following:

1) Change the date. It should be in the future. I'll be running a review that concludes on March 5, and then on March 19. You can pick these dates, or some date that follows one of them (the review date can be a few days ahead of the actual release date).

2) Provide review information on the "Review Information" page

3) Submit the project's IP Log for review [2].

4) Get approval on the completed review information from the PMC.

Once this is in place, I can schedule the review.

Note that I just noticed that the IP Log generator isn't functioning for the GitHub-based Vert.x project. I have a fix that I'll deploy shortly. I'll let you know.

HTH,

Wayne

[1] https://wiki.eclipse.org/Development_Resources/HOWTO/Release_Cycle
[2] http://www.eclipse.org/projects/ip_log.php?id=rt.vertx

On 02/17/2014 03:25 AM, Tim Fox wrote:
Hell All,

I am new to this game, but would like to release Vert.x 2.1.0 soon. I have created a release plan here:

https://projects.eclipse.org/projects/rt.vertx/releases/2.1.0/plan

Thanks


_______________________________________________
rt-pmc mailing list
rt-pmc@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/rt-pmc

--
Wayne Beaton
Director of Open Source Projects, The Eclipse Foundation
Learn about Eclipse Projects
EclipseCon 2014

--
Wayne Beaton
Director of Open Source Projects, The Eclipse Foundation
Learn about Eclipse Projects
EclipseCon 2014


_______________________________________________
rt-pmc mailing list
rt-pmc@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/rt-pmc



_______________________________________________
rt-pmc mailing list
rt-pmc@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/rt-pmc

--
Wayne Beaton
Director of Open Source Projects, The Eclipse Foundation
Learn about Eclipse Projects
EclipseCon
          2014

Back to the top