Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [platform-releng-dev] 4.20 I-Build: I20210324-0320 - BUILD FAILED - Analysis and with root cause.



On Wed, Mar 24, 2021 at 7:31 PM Mickael Istria <mistria@xxxxxxxxxx> wrote:
Rebasing via CLI doesn't change the commit date by default; so I'm not certain "Rebase always" from Gerrit does.
In m2e, we've faced the same problem recently, which is made more visible with a lot of changes merged in a short time-frame (like Platform on the beginning of M1) while it uses GitHub "Rebase and merge" action. So it seems that the GitHub rebase doesn't change the dates either. I'd be (positively) surprised if Gerrit does it differently than Git CLI and GitHub.

Documentation say "Similar to Rebase If Necessary, but creates a new patch set even if fast forward is possible. This strategy is also similar to Cherry Pick; however, Rebase Always does not ignore dependencies"
so it sounds like what we need.
_______________________________________________
platform-releng-dev mailing list
platform-releng-dev@xxxxxxxxxxx
To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/platform-releng-dev


--
Aleksandar Kurtakov
Red Hat Eclipse Team

Back to the top