Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [platform-releng-dev] [eclipse-build]Build I20101207-2000 (Timestamp: 201012072000):Build is complete. Test failures/errors occurred.

The releng test DNF is due a a problem with the chkpii executable.  I'm in the process of fixing this.

Kim



From:        Kim Moir/Ottawa/IBM@IBMCA
To:        platform-releng-dev@xxxxxxxxxxx
Date:        12/08/2010 07:45 AM
Subject:        [platform-releng-dev] [eclipse-build]Build I20101207-2000        (Timestamp: 201012072000):Build is complete. Test        failures/errors occurred.
Sent by:        platform-releng-dev-bounces@xxxxxxxxxxx




Build I20101207-2000 (Timestamp: 201012072000):  Automated JUnit testing is complete.  Test failures/errors occurred in the following:  

org.eclipse.releng.tests_win32.win32.x86_6.0


HTTP Download:

http://download.eclipse.org/eclipse/downloads/drops/I20101207-2000


Test result files (hint: copy/paste or drag-and-drop to the JUnit view):

http://download.eclipse.org/eclipse/downloads/drops/I20101207-2000/testresults/xml/org.eclipse.releng.tests_win32.win32.x86_6.0.xml

_______________________________________________
platform-releng-dev mailing list
platform-releng-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/platform-releng-dev


Back to the top