Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[platform-releng-dev] Updated freeze plan


It was pointed out that the scheduled 3.4.2 RC1 build was at the same time as a 3.5 M5 milestone build. After discussing with Kim, it looks like the best we can do is end of day on Tuesday instead of Wednesday morning for the RC1 build. That gives time for the RC1 build to complete before the 3.5 M5 candidate builds start. There may be time later in the week for RC1 rebuilds if needed. The freeze plan and build schedules have been updated accordingly:

http://www.eclipse.org/eclipse/development/freeze_plan_3_4_2.php
http://www.eclipse.org/eclipse/platform-releng/buildSchedule.html


Back to the top