Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [orbit-dev] When is the final R-build for Oxygen scheduled?

Roland Grunberg wrote:
> Ideally I would like to have our final R-build be done by RC1 or RC2 of
> the simultaneous release. Looking at past releases, bundles have been
> introduced during such a time frame but we should try to limit changes
> to bug fixes.

Makes sense.

> Before I finalize the R-build I'll announce a final call for
> contributions or bug fixes to existing packages.
> 
>  Thanks for giving a heads up for those possibly new additions. Are
> there CQs that existed from before the CQ deadline or would it even be
> possible for an exemption ?

These CQs (CQ 13012 ff.) have unfortunately been created after the
deadline, as Bug 513809 [2] reared its ugly head only with Oxygen M6
(which was after the deadline). While it looks like that Thomas Watson
found a solution to the root problem [3], we at Code Recommenders would
still like to make the (tiny) jump from the discontinued Eclipse Aether
1.0.1 to Maven Resolver 1.0.3 so that we can tweak the manifests if
Thomas' solution doesn't work.

We haven't gotten an exception about this. I wrote EMO an informal email
about this to give them a heads up, but haven't heard back from them.

So, does anyone know what the formal process is for this? I haven't
found anything in the wiki.

Best wishes,

Andreas

[1] <https://dev.eclipse.org/ipzilla/show_bug.cgi?id=13012>
[2] <https://bugs.eclipse.org/bugs/show_bug.cgi?id=513809>
[3] <https://bugs.eclipse.org/bugs/show_bug.cgi?id=514149>

-- 
Codetrails GmbH
The knowledge transfer company

Robert-Bosch-Str. 7, 64293 Darmstadt
Phone: +49-6151-276-7092
Mobile: +49-170-811-3791
http://www.codetrails.com/

Managing Director: Dr. Marcel Bruch
Handelsregister: Darmstadt HRB 91940

Attachment: signature.asc
Description: OpenPGP digital signature


Back to the top