Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[mylyn-integrators] m2eclipse, task switching and source-code switching

Hi folks,

I had a dream last night ... I switched my tasks ... and every time the
workspace content switched too. I activate Task A and all Workspace
Projects show me the code for doing Task A ... I hacked something, then I
got an error report ... I activate Task B (then mylyn ask me : "Do you
want commit the changes for Task A to the local branch XXX? ... Yes) ...
now the Workspace contains the code for Task B ... and so on.

I think this could be possible if the whole workspace is a git repository.
Each first task activation can create a local branch (and maybe there is a
attached fetch url for update the feature development with other team
members)

What do you think?

Regards
Andreas
-[http://www.ahoehma.de]-



Back to the top