Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[mylyn-integrators] Rich Task Editor refresh

I'm working on bug 184532: [connector] Generic SQL connector
https://bugs.eclipse.org/bugs/show_bug.cgi?id=184532

I'm now in the stage to create the rich task editor. I have one but whenever I open one it must be refreshed manually.

Where in the code should I make sure that the RepositoryTaskData is updated and displayed immediately on opening the editor?

Maarten





Back to the top