Re: [modeling-pmc] Too Many Guava CQs
|
Wayne,
As you can see below, this is all very academic, and I don't care to
pursue an academic exercise. Please reduce the number of required CQs
to just the version on the train so that the view passes and is complete.
Regards,
Ed
On 02.06.2016 09:13, Ed Willink wrote:
Hi Ed
I don't think that you should need to approve any of the extra Guava
piggy back CQs.
Each has a primary CQ satisfying the Eclipse requirement for IP
diligence.
OCL and QVTd have Guava 10 PiggyBack CQs satisfying the requirement
for per-project Orbit traceability.
The additional pig-sty of CGs seems to be a complete nonsense. It is
required because the IP policy fails to accommodate the reality of
rapid version change by an Orbit component.
If the pig-sty is required, as indicated by Sharon, then the CQs
should be auto-approved (albeit manually) by the IP team. Better the
IP team should recognize that they are pointless and auto-generate the
pig-sty for all projects. Or perhaps Guava new-version primary CQs
should be designated as NV CQs of the original version so that a PB CQ
of a particular version inherits the full chain of NV CQs.
At the moment it seems that the IP team is creating a dilemma. If I do
nothing ...
QVTd will fail its release review shortly before the Simulataneous
release. As a +3 incubation project, exclusion of QVTd will not affect
anyone, but a post RC5 respin will be required delaying the Neon release.
OCL will similarly fail and a few projects will have to rework post
RC5 to ensure that OCL is a truly optional dependency. A few projects
will be unable to rework in the timescale and will have to follow OCL
out of the train. An unrealistic disruption for a purely academic
review failure.
Alternatively I withdraw the CQs and knowingly violate the clearly
expressed requirement for these CQs. If I update the review
documentation to indicate that I know of this academic IP violation,
the reviews should fail.
Without the pig-sty of CQs, it seems that either I must provide
knowingly false review documentation, or the IP team must revise the
IP policy for Guava.
Regards
Ed Willink
On 02/06/2016 07:00, Ed Merks wrote:
Wayne,
While I see the technical point Ed Willink is making about which
version of Guava he should PB CQ, given that ranges (or the unbounded
range) are involved in the requirement and at install/runtime could
be installed/wired with any version, I feel it's splitting hairs in a
way that creates extra work for everyone involved to open a PB CQ for
every version of Guava known to mankind. The 15.0 version is the
one on the Neon train (and is approved), and I approved the 19.0
(latest) version. I don't see all other modeling projects creating a
flood of PB CQs in these cases, nor to I want to see that. It seems
superfluous, so I'll draw the line with this workflow based on the
expectation that each project will file a single PB CQ a given
library they are using for their release. Technically, looking at the
OCL repo, they are not actually redistributing Guava in the
repository, but the project is on the train, so it will generally
install with Guava 15.0.0. Approving that CQ is sufficient from my
point of view.
Regards,
Ed
-----
No virus found in this message.
Checked by AVG - www.avg.com
Version: 2016.0.7598 / Virus Database: 4591/12342 - Release Date:
06/01/16