To add one more thing to this thread ;-)

As part of the architectural review and approval, next week I will be setting up calls with the commiters of the affected components to verify the description, design and sizing of all p1s targeted to 3.3 or 4.0. We will also start considering which iteration an enhancement is targeted for.

Thanks for your time.
--------------------------------------------------------------------------
Harm Sluiman, STSM,  
phone:905-413-4032   fax: 4920  
cell: 416-432-9754
mailto:sluiman@xxxxxxxxxx
Admin : Gabrielle Chapman chapmaga@xxxxxxxxxx  Tie: 969-2323



Michael Norman <Michael.Norman@xxxxxxxxxxxxx>
Sent by: hyades-dev-admin@xxxxxxxxxxx

12/10/2004 10:35 AM

Please respond to
hyades-dev

To
cc
hyades-dev@xxxxxxxxxxx
Subject
[hyades-dev] IMPORTANT Re: TPTP (aka Hyades) 3.3 and 4.0 Plan Finalization





Team,

As Tyler suggests we are currently dealing with a small number of
requirements issues relating to the 3.3 and 4.0 plans.  A crucial change
was made at the planning meeting that in order to get rid of a "bulge"
in the resource we needed to apply in Q1 next year, we would reschedule
3.3 so that it happens in June at the same time as the 4.0 release.  The
reason for maintaining the two releases is that some consumers will want
to take the 4.0 release with all its new features on top of the Eclipse
3.1 base, but soeme will not be able to do so because, for example, they
anticipate being deployed as plug-ins into a pre-installed Eclipse 3.0.x
base.

However, at the point at which we were gathering requirements the
expectation was that our 3.3 release was to happen in March, and so
there were two reasons they may have been targeted to that release
a) they required a 3.0.x Eclipse base
b) they were required in March.

Come what may the release is not going to happen in march, so at this
stage we would like to identify any enhancement requests currently
targeted at 3.3 which do not require a 3.0.x eclipse base. These
enhancement requests will be retargeted to 4.0 which will reduce the
amount of dual maintenance we have to do on them (because of structural
changes at this release, the dual maintenance overhead is significant).

So, please can you identify to me by email or through a requirements
group representative from your company any 3.3 enhancement requests we
can retarget to 4.0.  This applies to all priorities whether committed
to plan or not.  I need your responses by Wednesday of next week so that
the Requirements group can synthesize its input on thursday.  As a
carrot, the reduction in dual maintenance workload may mean some
additional P2 enhancement requests make it into 4.0.

Thanks,

Mike

Tyler Thessin wrote:



> Folks,
>
> For the last couple of months, our TPTP Requirements, Architecture, and
> Planning Groups have been defining plans for the TPTP 3.3 and 4.0 releases
> for which we are nearing completion.
>
>
> You can find the targeted list of enhancements for each of these releases on
> our website:
>
> http://dev.eclipse.org/viewcvs/indextools.cgi/~checkout~/hyades-home/docs/unapproveddrafts/project%20info/plans/3+/TPTPFeatures.html
> (click on 3.3 and 4.0 tabs for respective list of targeted enhancements).
>
> "In Plan" = "Committed" indicates the enhancement is included in the
> respective plan.  "Priority" = "P1" and "In Plan" = "Pending" will be
> resolved prior to finalizing the plan.  "Priority" = "P2" or "P3" and "In
> Plan" = "Pending" generally means that one should not assume that these
> requests will be addressed in the plan.
>
>
> Our next steps toward finalizing these plans are as follows:
> - Requirements Group: Finalize another update to our 2005 TPTP Themes.
> - Requirements Group: Finalize assignment of 3.3 / 4.0 enhancement requests
> to TPTP Themes.
> - Requirements Group: Confirm whether any further 3.3 requirements can be
> moved to 4.0.
> - Architecture Group: Finalize any remaining / questionable enhancement
> effort sizings.
> - Architecture Group: Finalize mapping of enhancement implementation to plan
> iteration cycles.
>
>
> Our plan to the finalize the TPTP 3.3 and 4.0 plans includes completion of
> the above steps by Thursday, December 16, followed by Planning Group
> approval Friday, December 17, and announcement at the Committer Call Monday,
> December 20.
>
>
> (!) Change from tentative roadmap: We had previously tentatively targeted
> the TPTP 3.3 release for March 2005, however in our current plan proposal,
> we have deferred this release to June 2005.  Why you ask would we target a
> simultaneous TPTP 3.3 and a 4.0 for June 2004?  First, some clarifications:
> TPTP 3.3 and 4.0 will be respectively based on the Eclipse Platform 3.0 and
> 3.1 (the TPTP 4.0 feature set will be inclusive of the TPTP 3.3 feature set,
> however the TPTP 3.3 feature set will be minimized to support only those
> consumers that cannot move to Eclipse Platform 3.1 in that timeframe).  Our
> TPTP 3.0 release is required because some consumers require some TPTP
> enhancements which we cannot complete until June 2005, but they cannot move
> to the Eclipse Platform 3.1 (i.e., they cannot just use TPTP 4.0).  At the
> same time, other consumers need a different set of TPTP enhancements and
> Eclipse Platform 3.1 support, and the June time constraint.
>
>
> We welcome your feedback on these proposed plans.
>
>
> Thanks to Mike Norman and the entire TPTP Requirements Group for
> gathering/targeting community enhancement requests, Harm Sluiman and the
> entire Architecture Group for evaluating and sizing the requests, and the
> Planning Group for working through resource allocation and constraints as
> needed to define these plans.  Also, thanks in advance for your feedback on
> the plans.
>
>
> --tyler
>
>