[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
RE: [hyades-dev] PMC transition and Post-3.0 plan
|
Alan,
The 3.0.1 is something the WSWB team seems to want and is lined up with
an Eclipse release and is basically a bug-fix for those taking 3.0. The
3.1 release mainly contains a bunch of new agents (most notably JMX/PMI,
and probably various O/S es) and is something we (Scapa) need. I don't
think IBM plans to pick it up, certainly not in the WSWB stream,
although because it is a declared GA release we can pick it up and use
it alongside WSWB 3.0 without compromising certification.
I take your point about the names, although I may have missed out a
decimal point 3.0.1
You ended up posting to hyades-dev anyway, which is the right place.
I also guess Harm just replied to this as well.
Mike
-----Original Message-----
From: apratt [mailto:apratt@xxxxxxxxxx]
Sent: Wednesday, June 02, 2004 6:38 PM
To: hyades-dev
Subject: Re: [hyades-dev] PMC transition and Post-3.0 plan
Mike,
At the risk of "fracturing the discussion," has anybody else noticed
that
there are two releases in September? I don't know what "coverage
expansion" means, and neither will people deciding which Hyades to pull
and why. (I'd check that URL but the external network is down or too
slow.)
Furthermore, having those two releases with very similar version numbers
is going to be a problem. The numbers 3.1 and 3.01 are only
distinguishable if you see them both in the same sentence. If you see
"3.1" written or hear it spoken by itself, it's ambiguous: you don't
know
whether the writer or speaker is being imprecise and is really referring
to 3.01.
I'll take this to hyades-dev if you think it's appropriate, but I wanted
to ask on the side in case it has already been discussed.
-- Allan Pratt, apratt@xxxxxxxxxx
Rational software division of IBM
_______________________________________________
hyades-dev mailing list
hyades-dev@xxxxxxxxxxx
http://dev.eclipse.org/mailman/listinfo/hyades-dev