Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[higgins-dev] Agenda for Higgins developers call on Thur, August 27 at Noon EDT

LOGISTICS: Time: noon Eastern (16:00 UTC) U.S. Dial-in: 1-866-362-7064 / 89-2048#

AGENDA

1) [Brian] HIGGINS 1.1M7 BUILD COMPLETE
  • Build complete on August 25 [1]
  • Clean-up of links underway to point to latest builds

2) [Paul] PROPOSAL TO HAVE  COMPONENT WIKI AND COMPONENT PHP BUILD PAGES
  • Alternate approach to [282699]
  • Leave the components pages alone (except remove the LEDs)
  • Change [2] in the following ways:
    • Add in all of the missing components that didn’t build correctly, and put red LEDs on them (in the appropriate column).
    • Delete the text in the “Links” and “Downloads” sections (for now)--better to have nothing, then wrong/misleading text.

3) [Markus] REVIEW OF NEW IDAS CLIENT  [3]


Brian Walker
VP of Engineering
Azigo




Back to the top