Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[higgins-dev] Agenda for Higgins developer call March 26 at noon ET

Title: Agenda for Higgins developer call March 26 at noon ET
Logistics
Time: noon Eastern
Dial-in: 1-866-362-7064 / 89-2048#

Agenda
1. [Brian] 1.1M6 [1] - completed

  • Google Contacts CP is included
  • Our build system now supports Java 1.4 and 5.0 [Valery?]

2. [Brian, Paul] 1.1M7 Planning

  • Raising the bar
  • Implement new downloads page structure [3b]
    • PSF file
    • Wiki page with manual build instructions
    • Automated build (if possible)
    • Manual regression test link
    • All dependencies as separate projects

2. [Brian, Alexander, Andy] Selector Architecture Harmonization   
  
  • See [2]   
  • Synchronizing CardStore status-update

3. [Mary] EclipseCON update

4. [Markus]  IdAS Authentication
  
  • Markus is working on a proposal [4]

5. [Paul] Website improvements
  
  • Moved ver2 staging area [5] to production
  • New “All Selectors” diagram [6]
  • 2.1 New solution names [3]

6. [Paul, JohnB] Relationship Brokering With R-Cards [7]


[1] http://wiki.eclipse.org/Higgins_1.1M6
[2] http://wiki.eclipse.org/Selector_Architecture_Harmonization
[3] http://wiki.eclipse.org/Higgins_1.1_Plan#Website
[3b] http://wiki.eclipse.org/Higgins_1.1_Plan#New_Downloads_Page
[4] http://wiki.eclipse.org/Authentication_Materials
[5] http://www.eclipse.org/higgins/ver2/index.php
[6] http://wiki.eclipse.org/Selector_Overview#H1.1_All_Selectors
[7] http://wiki.eclipse.org/Relationship_Brokering_With_R-Cards
 

Back to the top