Hi All - an update from our Higgins Dev meeting this week for next steps on M3 milestone build: - We will *POSTPONE* the M3 build originally scheduled for this Friday 25-July.
- We ask Jim S. and Tom D. to review the scope and propose possible bug fix timelines for four (4) requested bugs:
- Depending on the proposed timing of when these bugs could be delivered to the 1.1 branch, we will then determine the build schedule options - either:
- Delay M3 further to include fixes for these four requested items or...
- Go ahead and complete M3 build next week *without* these four requested items and plan for including these items in another future build - either M4 (5-Sept target date) or do an intermediate build between M3 and current M4 target build date.
regards....Brian
On Jul 23, 2008, at 11:21 PM, brian walker wrote: Hi All - I updated the M3 milestone build status. I left the four tickets Ranjan mentioned below as open. Three are assigned to Tom D. and one (237135) is assigned to Jim. If you could indicate if it is possible to get these 4 issues fixed in near term we can adjust our M3 build schedule if necessary. Please provide feedback as to the state and timeline of when these 4 bugs can be addressed.
There is one additional bug I had a question on of whether they can be included in this M3 build? - 229639 - Track Google Contacts CP implementation for IdAS - Mohammad is assignee
thanks...Brian Brian Walker =brian.walker VP of Engineering Parity Communications Inc cell: 781-801-0254