Hi Folks,
 
Unfortunately I will not be able to attend the subject meeting tomorrow.  Please find the status for the CI, CM and UCDD practices below:
 
1. Work Done
 
a. Reviewed bugs raised against OpenUP V1.0 to determine which are applicable to the practices and which can be closed.
    i) Closed https://bugs.eclipse.org/bugs/show_bug.cgi?id=195112 as this has been overtaken by events with move to practice library structure.
    ii) Re-categorized https://bugs.eclipse.org/bugs/show_bug.cgi?id=167862 as UCDD: so it appears in queries and assigned the bug to me.
    iii) Re-categorized https://bugs.eclipse.org/bugs/show_bug.cgi?id=216994 as CI: CM: so it appears in queries and assigned the bug to me.
    iv) Re-categorized https://bugs.eclipse.org/bugs/show_bug.cgi?id=145775 as UCDD: so it appears in queries and assigned the bug to me.
 
b. Reviewed CI content in practice library and had a telecon with Bruce Macisaac and Yvonne Daily to discuss work for CI practice.  Raised the following bugs and assigned them to me:
 

ID

Changed

Sev

Pri

Plt

Status

Product

Comp

Vers

TargetM

Summary

229143

Tue 08:07

nor

P3

PC

ASSI

EPF

Content

1.0

---

CI: Provide content for Roadmap: How to Adopt this Practi...

229147

Tue 08:08

nor

P3

PC

ASSI

EPF

Content

1.0

---

CI: Create supporting material: Practice Enablement for t...

229148

Tue 08:09

nor

P3

PC

ASSI

EPF

Content

1.0

---

CI: Provide content for custom category: Continuous Integ...

229149

Tue 08:10

nor

P3

PC

ASSI

EPF

Content

1.0

---

CI: Review steps of task: Integrate and Create Build to m...

 

c. Raised the following bugs related to CM practice and assigned them to me:

 

ID

Changed

Sev

Pri

Plt

Status

Product

Comp

Vers

TargetM

Summary

229153

Tue 08:13

nor

P3

PC

ASSI

EPF

Content

1.0

---

CM: Provide content for Roadmap: How to Adopt this Practi...

229156

Tue 08:14

nor

P3

PC

ASSI

EPF

Content

1.0

---

CM: Provide content for custom category: Change Management

229157

Tue 08:15

nor

P3

PC

ASSI

EPF

Content

1.0

---

CM: Create supporting material: Practice Enablement for t...

 

d. Resolved https://bugs.eclipse.org/bugs/show_bug.cgi?id=226617

 

e. Reviewed Method Authoring Method.

 

2. Worked planned for next iteration

 

a. Continue review of practice library and raise additional work items as required.

b. Review, prioritize and assign work items to the next iteration. (Will schedule a telecon for all those interested in participating).

c. Resolve as many work items as possible (shooting to resolve 35% in the next iteration).

 

3. Issues

 

a. Day job keeps getting in the way of EPF work 8-).

 

4. Summary of open work items

 

a. Open Work Items for UCDD: Practice:

 

ID

Changed

Sev

Pri

Plt

Status

Product

Comp

Vers

TargetM

Summary

226781

2008-04-22

nor

P3

PC

NEW

EPF

Content

unspe

---

UCDD: SV: links to non-existing tasks/guidelines

145775

Tue 08:20

enh

P3

PC

ASSI

EPF

Content

0.9

---

UCDD: Artifact Use Case Story Board to be considered for...

167862

Tue 08:19

nor

P2

PC

ASSI

EPF

Content

0.9

---

UCDD: RM - Complete review of Guideline: Effective Requir...

216989

Fri 14:42

nor

P3

PC

ASSI

EPF

Content

1.0

---

UCDD: SV: Refactor the Requirements discipline into corre...

223152

2008-04-23

nor

P3

PC

ASSI

EPF

Content

1.0

---

UCDD: Concept: Use Case needs to be refactored

 

 

b. Open Work Items for CI: Practice

 

ID

Changed

Sev

Pri

Plt

Status

Product

Comp

Vers