[epf-dev] Re: [Scrum] Proposed Agenda - Scrum Status Call - 18 Oct 2007

Oops! here is the link to the revised Introduction page (work in progress).

On 10/17/07, Lyndon Washington <hoshposh@xxxxxxxxx > wrote:
Hi All,

Here is an agenda for the status call.

1. Review what we achieved over the last week.
  • Introduction page collaboration (Bug: 176503)
  • Bug priority & severity reassignment
2. Plan out the next week
  • Release the Introduction to the Wiki or into the plugin?
  • What is next to attack?

3. AOB

Please reply to this if there is anything else you would like to discuss or bring up.

Below are the current bugs:
ID Sev Pri OS Assignee Status Resolution Summary
176503 nor P3 All mjv@xxxxxxxxxxxxxxxxx ASSI
[scrum] - Develop guideline for Introduction of Scrum
184288 nor P3 Linu hoshposh@xxxxxxxxx ASSI
[scrum] Scrum phases should get added as a Delivery process
185390 nor P3 Linu hoshposh@xxxxxxxxx ASSI
[scrum] Need an index added to the Scrum plugin.
186145 nor P3 Linu hoshposh@xxxxxxxxx ASSI
[Scrum] Need to define a vision or scope for the initial plugin release
200409 nor P3 Wind epf.content-inbox@xxxxxxxxxxx NEW
[scrum] Scrum plug-in needs an about box
202364 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] Need a more complete description for the Introduction page
202365 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] The left-hand navigation for "Introduction" needs new sub-headings
202366 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] The references page needs to be improved to include other relevant sites
202367 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] The main description is not consistent with the listed relationships
202368 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] Redundant Information for Scrum Artifacts content
202369 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] There should be an artifact description for the definition of "Done"
202370 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] Move "Applying Scrum" Content
202371 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] LifeCycle content page needs a description
204299 nor P3 Linu epf.content-inbox@xxxxxxxxxxx NEW
[Scrum] Artifact: Sprint Backlog incorrectly states that the ScrumMaster is responsible for the artifact

Cheers,
-Lyndon-