Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[cross-project-issues-dev] How to trigger rebuild of simrel staging site?

I've pushed a change [0] to the simrel repo, but the last build [1] appears to have happened on Aug 9.

How can I trigger a rebuild? Why is the job still disabled? (I bet it's because of summer holidays.) :D

[0] https://git.eclipse.org/c/simrel/org.eclipse.simrel.build.git/commit/?id=8ea621c732cdf410bf751409d0aa6f1521fc7800
[1] https://ci.eclipse.org/simrel/view/All/job/simrel.runaggregator.pipeline/

Asking because I need the simrel repo to be rebuilt so I can validate this gerrit [2] for a change to EPP [3].


--

Nick Boldt

Principal Software Engineer, RHCSA

Productization Lead :: JBoss Tools & Dev Studio

IM: @nickboldt / @nboldt / http://nick.divbyzero.com



“The Only Thing That Is Constant Is Change” - Heraclitus

Back to the top