Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [cross-project-issues-dev] Respin of SimRel Repository required

My apologies for not communicating more quickly the information back to this list. Entirely my oversight.

The final EPP packages themselves are available from:

  https://hudson.eclipse.org/packaging/job/neon.epp-tycho-build/388/artifact/org.eclipse.epp.packages/archive/

If anyone wants to try an "update scenario you should use the following two repositories. (And have only them enabled.)

But, remember, the main "test result" ... at least from previous EPP installations ... is that you should "not be allowed to update". If you were, the new installation would be broken since there was such a large change in structure from previous (Mars) version of EPP packages.

 
http://download.eclipse.org/technology/epp/packages/neon/RC4/and
 
http://download.eclipse.org/staging/neon/

Assuming no "catches the machine on fire" type bugs these will become our Neon release on 6/22.

Thanks,





From:        Matthias Sohn <matthias.sohn@xxxxxxxxx>
To:        Cross project issues <cross-project-issues-dev@xxxxxxxxxxx>,
Date:        06/15/2016 06:05 PM
Subject:        Re: [cross-project-issues-dev] Respin of SimRel Repository required
Sent by:        cross-project-issues-dev-bounces@xxxxxxxxxxx




any update on the current status of the repository and availability of packages for testing ?

On Mon, Jun 13, 2016 at 6:07 PM, David M Williams <david_williams@xxxxxxxxxx> wrote:
Extended team,

I am beginning a re-spin of the Sim. Release repository.


Two major changes: SOA-BPN2 modeler removed and Window Builder removed.


The former removed because they didn't finish the normal release requirements. The later was removed because it has not been tested with the Neon candidate release. (It did recently, after RC4, get a build which "removed one line of code" which prevented it from running on Neon ... but, our goal is not for projects to "join at the last minute" but to be part of the train for many milestones so it can be adequately tested).


It is my understanding both projects plan to "rejoin the train" in the September release.


A minor change: Linux Tools found a major memory leak which would normally not be "respin worthy", but I told them if we had to respin for other reasons they could include a fix for that.


The EPP packages will need to be rebuilt of course -- first because they always are if the repository changes, but more so this time because Window Builder was included in two EPP packages and of course will have to be removed from those packages.


I will update this list once both steps are complete.


Thanks,





_______________________________________________
cross-project-issues-dev mailing list

cross-project-issues-dev@xxxxxxxxxxx
To change your delivery options, retrieve your password, or unsubscribe from this list, visit

https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@xxxxxxxxxxx
To change your delivery options, retrieve your password, or unsubscribe from this list, visit
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev


Back to the top