Hi Tania,
On a related topic, can we discuss the
details for the iteration build in the next Community call, please? We
discussed some of what's needed for the iteration build in the last Summit
call but some details were not fleshed out. I'd like to summarize my expectation
of what RE is being asked to do and close on the details so that everyone
is clear on what's happening. I've filled in the details based a little
bit on what happened in TPTP and I expect that there will be some debate
and we'll need to finalize this in the next Community call.
Declaring an integration driver
*
During the last week of development in the iteration, all code check-ins
stop once the candidate weekly integration driver is built.
*
RE announces the candidate weekly integration driver but CVS is not
yet open for new code. COSMOS is in shut-down mode. The JUnits will
be run on the candidate weekly driver, the results posted to cosmos-dev,
and the results reviewed in the Architecture call as usual.
*
During shut-down mode, if a developer wants to check in any changes for
the candidate iteration build, that developer must request permission from
the Leads (Project, Architecture) before those changes are checked in.
*
The developer sends the request for permission to the cosmos-mgmt mailing
list. This request identifies the changes to be checked in, why they can't
be deferred to a future iteration, and the risk of the change. (Where "risk"
means "what could be broken if we allow this change?".)
*
A Lead allows or defers the changes and cc RE so that RE can track the
list of bugzillas allowed in. RE maintains a wiki site with a cumulative
list of the bugzilla numbers and details provided by the developers.
*
On Friday morning at 9:00 AM, RE sends that list of bugzillas and files
changed to cosmos-dev and anyone affected by any of the changes checked
in during shut-down mode runs the JUnits that test just the affected code.
(Don't know if it's possible to separate the JUnits like that, but that's
the ideal to reduce the amount of time needed for testing.) Any problems
found are fixed ASAP.
*
On Monday at 9:00 AM, someone from RE will send a post to cosmos-dev identifying
the official integration driver to be used for the testing and stating
that CVS is now open.
The reason we moved the code cutoff
is so that we would have two days to identify and fix major problems before
turning the build over to QA without working through the weekend. Requiring
approval for check-ins would give us time to make sure the build is stable
and give a small amount of flexibility to check in last-minute code.
Thanks,
Ruth.
Ruth Lee
IBM Toronto Lab
ruthdaly@xxxxxxxxxx
T/L 313-4453
Tania N Makins <tmakins@xxxxxxxxxx>
Sent by: cosmos-dev-bounces@xxxxxxxxxxx
02/14/2008 01:51 PM
Please respond to
Cosmos Dev <cosmos-dev@xxxxxxxxxxx> |
|
To
| "Cosmos Dev" <cosmos-dev@xxxxxxxxxxx>
|
cc
|
|
Subject
| [cosmos-dev] REVIEW REQUESTED TODAY:
Code Cutoff for Weekly Integration Builds |
|
Team,
Please review the process changes related to code cutoff for the weekly
integration builds below and respond with comments or a +1 if you are in
agreement by EOD today.
Weekly Integration Builds
- Weekly integration builds will be run
every Tuesday at 12:00
p.m. ET
- Code cutoff for integration builds is
as follows:
- All patches should be in bugzilla by
Monday at 12:00
p.m. ET
- All code should be checked into CVS
by 11:45 a.m. ET
on Tuesday
- CVS will be locked until
the build has completed successfully (typically for 1 hour). No code
should be checked in from 11:45 a.m. on Tuesday until notification of build
completion has been sent out.
- Each subproject team should run JUnits
on the candidate build and post results by 10:00
a.m. on Wednesday to be
reviewed during the architecture call. JUnits should be run individually
so that results can be reported accurately. (Note: The Data Visualization
team will perform a smoke test on the UI since the tests are manual)
- RE team will post notification to cosmos-dev
when the integration build is ready - target availability is 4:00 p.m.
on Wednesdays
Tania N. Makins, PMPĀ®
Project Manager, AC Open Source Components
IBM Software Group - RTP, NC
Office: (919) 254-8430 T/L: 444-8430
tmakins@xxxxxxxxxx_______________________________________________
cosmos-dev mailing list
cosmos-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/cosmos-dev