I'm assuming some of the recent defects
opened are targeted for the 1.2 stream, even though the target milestone
field was left blank as by default. Rather them leave them as blank, I've
moved them to 2.0 with the rest of the open defects.
I don't know what the Eclipse or CDT
practice is for fixing defects both in the current HEAD stream as well
as patching them back to a fielded release. Do two defects end up getting
opened, one targeted for the head stream and a cloned defect (does bugzilla
support this?) for the fielded stream? Or is it typically handled with
one defect, which gets resolved when the fix is patched back to fielded
stream after being fixed in the current stream?