| [birt-dev] Please check out stable build <20090618-0630>and response if it can be released as BIRT 2.5.0 Release Build |
|
Fellow BIRT committers,
2.5.0 Stable build <20090618-0630> has passed smoke tests,
regression tests and acceptance tests. Project leads and PMC members please check
out the stable build and response if it can be released as the BIRT 2.5.0
Release Build. Compared to last candidate build, All-In-One packages of this
build has integrated the Mylyn RC5 builds. BIRT code doesn’t have any
change between these two builds. Stable Build <20090618-0630> can be downloaded from the BIRT
download page: http://download.eclipse.org/birt/downloads/build.php?build=S-R1-2_5_0-S20090618-200906180630
Regards, BIRT Team |