Title: Eclipse ALF POC Schedule Meeting Tue 10/18 8:00 am PT
Attendees: Serena, Catalyst, Secure
Project Plan
Updates:
On
schedule for all tasks.
Hardware installed & internal access setup.
Need to get an IP address from all external companies (details in Tim's
email). Currently installing Serena products. Should be ready for
other POC participants installs the week of 11/28. Should have separate
installs on different java ports. If you prefer a particular port, let Tim
know. He would like to keep 8080 off-limits for the ALF event manager (or
may leave this off-limits for all for Tomcat). Can use Windows remote
control to install. Secure uses Mac so installs need to be addressed
- may need to use a Windows or possibly FTP. Tim will check with IT
on this. We'll need to coordinate days for folks to install on, so think
of times that work for you and we'll coordinate. Secure installation will
take ~30 minutes. Catalyst will need to reboot the machine with
install. We'll need to coordinate everyone getting on the machine - Tim
will work with this.
Action Item
Updates:
Version of Tomcat to use - Preferred version is
5.5.12. With separate installs, folks can use a different one if they
really prefer. Closed this action.
Sample Project
RCP -
- The Eclipse RCP
Web Browser example project will be an excellent candidate for Segue. Bob
is available to assist others or answer questions regarding this Browser
project.
- Secure is having issues, Tim will work with John on getting
the right version.
- Can be run independently.
-
Will work for Catalyst.
- Will leave open
1 more week to ensure everyone is working OK.
Versions of software for POC - Axis 1.1, JVM
1.4.2, Tomcat 5.5.12 - appear to be OK for all. Closed this
action.
- Notes from Bob:
I tested running the proposed Java 1.4.2 and Tomcat 5.5.* with the
compatibility jar files. I did this with Axis 1.1. My working web
stubs tested successfully. I would say to the group not to be concerned
about the compatibility jars: they simply add the xml parsing ability to java
1.4.2 by including the xerces xml parser and apis. I suspect that if the
xerces parser is unsuitable for a vendor, then they may be successful by putting
their parser jar in the %CATALINA_HOME%\common\endorsed\
directory.
I also tested the proposed Java
1.4.2, Tomcat 5.5.12, and Axis 1.1 configuration on a POC recommended Windows
2003 machine while simultaneously running the Segue tool’s Resin/Axis 1.1 web
services. I found no errors with these processes running
simultaneously.
Project names for POC - Tasks identified last
week. Will leave open to ensure this is properly
implemented.
VMWare Image - Need to
get copies of the image to POC
participants once we're done. We believe the OS key can work if we get a
key from the participants when we're ready to get copies. Everything else
should be an Eval license or internal products. The OS is Server
2003. Tim will work offline with folks when
needed.
Command line execution or some client to test Web
Services
- Notes from Bob:
I created an ant script that tests the Segue web services.
It executes and displays the results of a suite of JUnit tests. It follows
a simple usage that others may want to implement:
Command: “ant help” displays example
usage
Command: “ant test” runs the JUnit
test suite and shows results for each test. Points test to localhost port
8080 by default.
Command: “ant
–DsvcURL=http://alf.serena.com:8080/AlfTestMgtSvc test”, points tests to a
particular service URL, runs and shows test
results.
Sample test output
below:
C:\ant
test
test:
[junit] Testsuite:
com.segue.www.alf.poc.unittests._TestAlfPocTm
[junit] Tests run: 16, Failures: 0, Errors: 0,
Time elapsed: 6.309 sec
[junit] Testcase:
testAuthtenticateUser took 5.338 sec
[junit] Testcase:
testAuthtenticateUserNullValues took 0.13 sec
[junit] Testcase:
testAuthtenticateUserInvalidUser took 0.04 sec
[junit] Testcase:
testAuthtenticateUserInvalidPassword took 0.04 sec
[junit] Testcase:
testAuthtenticateUserInvalidAll took 0.03 sec
[junit] Testcase: testTestBuildAllValid took
0.08 sec
[junit] Testcase: testTestBuildProject took
0.08 sec
[junit] Testcase: testTestBuildProduct took
0.09 sec
[junit] Testcase: testTestBuildBuild took 0.05
sec
[junit] Testcase: testTestBuildVersion took
0.051 sec
[junit] Testcase: testTestBuildEventID took
0.05 sec
[junit] Testcase: testTestBuildTestType took
0.07 sec
[junit] Testcase: testNewTestResultsAllValid
took 0.03 sec
[junit] Testcase: testNewTestResultsStatus took
0.06 sec
[junit] Testcase: testNewTestResultsReference
took 0.05 sec
[junit] Testcase: testNewTestResultsCallBackURI
took 0.11 sec
Other Notes:
All
POC participants need to plan for licensing/eval of their software for the
POC. Secure & Catalyst plan to use Trial/Eval copies to share
software. Can it be extended or must it be re-installed? Need to
plan for refreshes as needed. Need to pass by Legal departments to ensure
everyone is OK with their plans.
No meeting next week. Next meeting Friday
12/2.
All,
There will be a schedule
meeting today at 11:00 a.m. PT for the ALF Proof of
Concept. Please plan to attend this if you are contributing to the POC or
are interested in hearing this information.
Call in number: 1-303-928-3232; ID
6723351
Agenda:
Review project plan &
actions (online at the ALF
site)
Discuss software
installations and access
**********************************************************************
This
email and any files transmitted with it are confidential and intended solely for
the use of the individual or entity to whom they are addressed. Any unauthorized
review, use, disclosure or distribution is prohibited. If you are not the
intended recipient, please contact the sender by reply e-mail and destroy all
copies of the original message.